If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0826020209004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.081387,"lon":-118.183955,"icon":""}]} |
| Location: 00/09-02-082-02W6/4 | |
| Location Alias: 00/09-02-82-02 W6M | |
| Location Alias 2: 00/09-02-082-02 W6/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 082 | |
| Meridian: 6 | |
| Range: 02 | |
| Section: 02 | |
| County/Municipality: Municipal District of Fairview No. 136 | |
| Well Name: PETRUS WHITELAW 9-2-82-2 | |
| Operator Name: Tallahassee Exploration Inc. | |
| License Number: 0167302 | |
| License Date: 1994-05-20 | |
| License Status: Issued | |
| Spud Date: 1994-05-31 | |
| Final Drill Date: 1994-06-06 | |
| Well Total Depth: 1055.00 m | |
| Surface Hole Latitude: 56.081387 | |
| Surface Hole Longitude: -118.183955 |
| Date | Event |
|---|---|
| 1994-05-20 | Obtained License |
| 1994-06-01 | Surface Casing Operation Performed |
| 1994-06-02 | Direction Drilling Operation Performed - Deviate |
| 1994-06-06 | Finished Drilling |
| 1994-06-06 | Well Mode changed to Drilled and Cased |
| 1994-06-07 | Well Log Performed |
| 1994-06-08 | Drill Stem Test Performed |
| 1994-06-09 | Drill Stem Test Performed |
| 1994-06-10 | Production Casing Operation Performed |
| 1994-06-10 | Rig Released |
| 1994-06-30 | Well Log Performed |
| 1994-07-13 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-13 | Well Log Performed |
| 1994-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-07-16 | Perforation Treatment Performed - Fractured |
| 1994-07-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-21 | Plug Back Performed |
| 1994-07-22 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-07-25 | Plug Back Performed |
| 1994-07-26 | Perforation Treatment Performed - Jet Perforation |
| 2001-09-28 | Well Log Performed |
| 2001-11-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-15 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-15 | Plug Back Performed |
| 2001-11-15 | Well Log Performed |
| 2001-11-16 | Well Log Performed |
| 2001-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-18 | Plug Back Performed |
| 2001-11-18 | Well Log Performed |
| 2001-11-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-11-19 | Plug Back Performed |
| 2001-11-19 | Well Log Performed |
| 2001-11-20 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-20 | Well Log Performed |
| 2001-12-01 | Well Began Production |
| 2001-12-01 | Well Fluid changed to Gas |
| 2001-12-01 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-06-02 | 343.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-07-13 | Perforation | 1032.00 | 1035.50 | 13 |
| 2001-11-17 | Perforation | 910.50 | 911.50 | 17 |
| 2001-11-17 | Perforation | 912.50 | 913.50 | 17 |
| 2001-11-18 | Packing Device Capped w/Cement | 899.00 | 907.00 | 0 |
| 2001-11-18 | Perforation | 886.00 | 888.00 | 17 |
| 2001-11-19 | Packing Device Capped w/Cement | 880.00 | 882.00 | 0 |
| 2001-11-20 | Perforation | 871.60 | 873.00 | 17 |
| 2001-11-20 | Perforation | 868.50 | 870.00 | 17 |
| 1994-07-16 | Fracture | 1032.00 | 1035.50 | 0 |
| 1994-07-16 | Acid Treatment | 1032.00 | 1035.50 | 0 |
| 1994-07-21 | Packing Device Capped w/Cement | 1022.50 | 1030.50 | 0 |
| 1994-07-22 | Perforation | 1012.00 | 1014.00 | 13 |
| 1994-07-25 | Packing Device Capped w/Cement | 945.00 | 953.00 | 0 |
| 1994-07-26 | Perforation | 883.50 | 884.50 | 13 |
| 2001-11-15 | Perforation | 995.00 | 998.60 | 17 |
| 2001-11-15 | Packing Device Capped w/Cement | 981.00 | 989.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 723 | 0.0 | 0.0 | 0.0 |
| 2002 | 8475 | 0.0 | 0.0 | 0.0 |
| 2003 | 8731 | 0.0 | 0.0 | 0.0 |
| 2004 | 8066 | 0.0 | 0.0 | 0.0 |
| 2005 | 8570 | 0.0 | 0.0 | 0.0 |
| 2006 | 8516 | 0.0 | 0.0 | 0.0 |
| 2007 | 8197 | 0.0 | 0.0 | 0.0 |
| 2008 | 8742 | 0.0 | 0.0 | 0.0 |
| 2009 | 8728 | 0.0 | 0.0 | 0.0 |
| 2010 | 8678 | 0.0 | 0.0 | 0.0 |
| 2011 | 8564 | 0.0 | 0.0 | 0.0 |
| 2012 | 8769 | 0.0 | 0.0 | 0.0 |
| 2013 | 8621 | 0.0 | 0.0 | 0.0 |
| 2014 | 8715 | 0.0 | 0.0 | 0.0 |
| 2015 | 8734 | 0.0 | 0.0 | 0.0 |
| 2016 | 8427 | 0.0 | 0.0 | 0.0 |
| 2017 | 8625 | 0.0 | 0.0 | 0.0 |
| 2018 | 8683 | 0.0 | 0.0 | 0.0 |
| 2019 | 8692 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]