X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826021102000

Well Details

Well ID: 0826021102000
Loading map...
Location: 00/02-11-082-02W6/0
Location Alias: 00/02-11-82-02 W6M
Location Alias 2: 00/02-11-082-02 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 11
County/Municipality: Municipal District of Fairview No. 136
Well Name: LONG RUN WHITELAW 2-11-82-2
Operator Name: Long Run Exploration Ltd.
License Number: 0002726
License Date: 1951-03-28
License Status: Suspension
Spud Date: 1951-03-26
Final Drill Date: 1951-06-06
Well Total Depth: 1306.40 m
Surface Hole Latitude: 56.088949
Surface Hole Longitude: -118.192994

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-28 Obtained License
1951-04-05 Drill Stem Test Performed
1951-04-12 Drill Stem Test Performed
1951-04-14 Drill Stem Test Performed
1951-04-16 Drill Stem Test Performed
1951-04-17 Drill Stem Test Performed
1951-04-18 Drill Stem Test Performed
1951-04-20 Drill Stem Test Performed
1951-04-22 Drill Stem Test Performed
1951-04-24 Drill Stem Test Performed
1951-04-25 Drill Stem Test Performed
1951-04-27 Drill Stem Test Performed
1951-04-28 Drill Stem Test Performed
1951-04-29 Drill Stem Test Performed
1951-05-01 Drill Stem Test Performed
1951-05-02 Drill Stem Test Performed
1951-05-04 Drill Stem Test Performed
1951-05-06 Drill Stem Test Performed
1951-05-07 Drill Stem Test Performed
1951-05-08 Drill Stem Test Performed
1951-05-10 Drill Stem Test Performed
1951-05-11 Drill Stem Test Performed
1951-05-13 Drill Stem Test Performed
1951-05-14 Drill Stem Test Performed
1951-05-16 Drill Stem Test Performed
1951-05-17 Drill Stem Test Performed
1951-05-18 Drill Stem Test Performed
1951-05-21 Drill Stem Test Performed
1951-05-27 Drill Stem Test Performed
1951-06-06 Finished Drilling
1951-06-06 Well Mode changed to Drilled and Cased
1951-06-08 Drill Stem Test Performed
1951-06-09 Drill Stem Test Performed
1951-06-14 Production Casing Operation Performed
1951-06-15 Perforation Treatment Performed - Bullet Perforation
1951-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1951-06-24 Perforation Treatment Performed - Bullet Perforation
1955-12-09 Well Began Production
1955-12-09 Well Fluid changed to Gas
1955-12-09 Well Mode changed to Flowing
1971-12-31 Well Fluid changed to Gas
1971-12-31 Well Mode changed to Suspended
1996-12-02 Perforation Treatment Performed - Jet Perforation
1996-12-02 Well Log Performed
1996-12-03 Perforation Treatment Performed - Jet Perforation
1996-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-06 Well Log Performed
1996-12-07 Perforation Treatment Performed - Jet Perforation
2000-09-23 Well Fluid changed to Gas
2000-09-23 Well Mode changed to Suspended
2004-11-01 Well Log Performed
2004-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-02 Perforation Treatment Performed - Jet Perforation
2004-11-02 Plug Back Performed
2004-11-02 Well Log Performed
2004-11-04 Perforation Treatment Performed - Chemical Squeeze
2004-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-06 Perforation Treatment Performed - Jet Perforation
2004-11-06 Plug Back Performed
2004-11-08 Perforation Treatment Performed - Jet Perforation
2004-11-08 Well Log Performed
2018-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-27 Plug Back Performed
2018-02-27 Well Fluid changed to Gas
2018-02-27 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-06-15 Bullet Perforation 1063.80 1068.60 13
2004-11-02 Packing Device Capped w/Cement 1013.00 1021.00 0
2004-11-02 Perforation 995.40 996.40 17
2004-11-04 Chemical Squeeze 995.40 996.40 0
2004-11-06 Packing Device Capped w/Cement 986.00 994.00 0
2004-11-06 Perforation 905.20 906.10 17
2004-11-08 Perforation 900.90 902.10 17
2018-02-27 Packing Device Capped w/Cement 867.00 875.00 0
2018-02-27 Packing Device Capped w/Cement 847.00 855.00 0
1951-06-21 Acid Treatment 1063.80 1068.60 0
1951-06-23 Packing Device Capped w/Cement 1009.20 1033.90 0
1951-06-24 Bullet Perforation 860.80 863.50 13
1951-06-24 Bullet Perforation 882.40 896.10 13
1996-12-02 Perforation 1063.80 1068.60 13
1996-12-03 Perforation 1065.00 1066.80 13
1996-12-04 Acid Treatment 1065.00 1066.80 0
1996-12-07 Perforation 1022.30 1024.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 248 0.0 0.0 0.0
1969 6295 0.0 0.0 0.0
1970 7490 0.0 0.0 0.0
1971 7537 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References