If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0826021709002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/09-17-082-02W6/2 | |
Location Alias: 00/09-17-82-02 W6M | |
Location Alias 2: 00/09-17-082-02 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 6 | |
Range: 02 | |
Section: 17 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: PETRUS GAGE 9-17-82-2 | |
Operator Name: Tallahassee Exploration Inc. | |
License Number: 0172327 | |
License Date: 1994-11-09 | |
License Status: Abandoned | |
Spud Date: 1994-11-13 | |
Final Drill Date: 1994-11-17 | |
Well Total Depth: 1092.00 m | |
Surface Hole Latitude: 56.110639 | |
Surface Hole Longitude: -118.265228 |
Date | Event |
---|---|
1994-11-09 | Obtained License |
1994-11-13 | Well Log Performed |
1994-11-14 | Surface Casing Operation Performed |
1994-11-17 | Finished Drilling |
1994-11-17 | Well Log Performed |
1994-11-17 | Well Mode changed to Drilled and Cased |
1994-11-18 | Well Log Performed |
1994-11-19 | Production Casing Operation Performed |
1994-11-19 | Rig Released |
1994-12-09 | Well Log Performed |
1994-12-10 | Perforation Treatment Performed - Jet Perforation |
1994-12-10 | Well Log Performed |
1998-11-08 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1998-11-08 | Perforation Treatment Performed - Jet Perforation |
1998-11-08 | Well Began Production |
1998-11-08 | Well Fluid changed to Gas |
1998-11-08 | Well Log Performed |
1998-11-08 | Well Mode changed to Flowing |
2001-10-01 | Well Fluid changed to Gas |
2001-10-01 | Well Mode changed to Suspended |
2005-08-15 | Well Fluid changed to Gas |
2005-08-15 | Well Mode changed to Flowing |
2005-10-01 | Well Fluid changed to Gas |
2005-10-01 | Well Mode changed to Suspended |
2012-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-03-05 | Plug Back Performed |
2012-03-05 | Well Fluid changed to Gas |
2012-03-05 | Well Log Performed |
2012-03-05 | Well Mode changed to Abandoned Zone |
2012-03-19 | Well Abandoned |
2012-03-19 | Well Fluid changed to Gas |
2012-03-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-12-10 | Perforation | 931.50 | 933.00 | 13 |
1998-11-08 | Bridge Plug, No Cement | 930.00 | 930.70 | 0 |
1998-11-08 | Perforation | 928.00 | 929.00 | 13 |
2012-03-05 | Packing Device Capped w/Cement | 910.00 | 920.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 1608 | 0.0 | 0.0 | 0.0 |
1999 | 7483 | 0.0 | 0.0 | 0.0 |
2005 | 252 | 0.0 | 0.0 | 0.0 |
For data sources see[5]