X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826042802000

Well Details

Well ID: 0826042802000
Loading map...
Location: 00/02-28-082-04W6/0
Location Alias: 00/02-28-82-04 W6M
Location Alias 2: 00/02-28-082-04 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 04
Section: 28
County/Municipality: Municipal District of Fairview No. 136
Well Name: HARVEST GEORGE 2-28-82-4
Operator Name: Harvest Operations Corp.
License Number: 0190201
License Date: 1996-08-02
License Status: Abandoned
Spud Date: 1996-08-25
Final Drill Date: 1996-09-02
Well Total Depth: 1515.00 m
Surface Hole Latitude: 56.132356
Surface Hole Longitude: -118.556806

For data sources see[1][2]

Well History

Date Event
1996-08-02 Obtained License
1996-08-26 Lost Circulation Occurred
1996-08-27 Surface Casing Operation Performed
1996-09-02 Finished Drilling
1996-09-02 Well Log Performed
1996-09-03 Drill Stem Test Performed
1996-09-05 Production Casing Operation Performed
1996-09-05 Rig Released
1996-09-05 Well Log Performed
1996-09-05 Well Mode changed to Drilled and Cased
1996-10-11 Perforation Treatment Performed - Jet Perforation
1996-10-11 Well Log Performed
2006-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-27 Plug Back Performed
2006-03-27 Well Log Performed
2006-03-27 Well Mode changed to Abandoned Zone
2006-03-29 Well Log Performed
2006-05-15 Perforation Treatment Performed - Jet Perforation
2006-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-16 Perforation Treatment Performed - Remedial Casing
2006-05-16 Plug Back Performed
2006-08-02 Perforation Treatment Performed - Jet Perforation
2006-08-02 Perforation Treatment Performed - Remedial Casing
2007-02-22 Well Abandoned
2007-02-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-10-11 Perforation 1410.00 1411.50 13
2006-03-27 Packing Device Capped w/Cement 1392.00 1400.00 0
2006-05-15 Perforation 570.00 571.00 20
2006-05-15 Perforation 569.50 569.90 36
2006-05-16 Remedial Casing Cementing 569.50 571.00 0
2006-05-16 Packing Device Capped w/Cement 548.00 564.00 0
2006-08-02 Perforation 500.00 501.00 17
2006-08-02 Perforation 499.50 499.80 36
2006-08-02 Remedial Casing Cementing 499.50 501.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-08-26 Lost Circulation 193.00 308.00

For data sources see[5]

References