If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0826050606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.076634,"lon":-118.77484,"icon":""}]} |
Location: 00/06-06-082-05W6/2 | |
Location Alias: 00/06-06-82-05 W6M | |
Location Alias 2: 00/06-06-082-05 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 6 | |
Range: 05 | |
Section: 06 | |
County/Municipality: Municipal District of Fairview No. 136 | |
Well Name: CEQUENCE GEORGE 6-6-82-5 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0047959 | |
License Date: 1973-11-08 | |
License Status: Suspension | |
Spud Date: 1973-11-08 | |
Final Drill Date: 1973-11-27 | |
Well Total Depth: 1664.20 m | |
Surface Hole Latitude: 56.076634 | |
Surface Hole Longitude: -118.774840 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-11-08 | Lost Circulation Occurred |
1973-11-08 | Obtained License |
1973-11-11 | Lost Circulation Occurred |
1973-11-15 | Drill Stem Test Performed |
1973-11-27 | Finished Drilling |
1973-11-27 | Well Log Performed |
1973-11-29 | Drill Stem Test Performed |
1973-11-30 | Drill Stem Test Performed |
1973-12-01 | Drill Stem Test Performed |
1973-12-02 | Production Casing Operation Performed |
1973-12-23 | Perforation Treatment Performed - Jet Perforation |
1973-12-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-01-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-01-07 | Perforation Treatment Performed - Fractured |
1974-01-11 | Perforation Treatment Performed - Jet Perforation |
1974-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-01-18 | Perforation Treatment Performed - Jet Perforation |
1974-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-01-20 | Perforation Treatment Performed - Cement Squeeze |
1974-02-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-02-17 | Well Mode changed to Drilled and Cased |
1978-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-01 | Well Began Production |
1980-10-01 | Well Fluid changed to Gas |
1980-10-01 | Well Mode changed to Flowing |
1984-08-01 | Well Fluid changed to Gas |
1984-08-01 | Well Mode changed to Suspended |
1988-10-01 | Well Fluid changed to Gas |
1988-10-01 | Well Mode changed to Flowing |
1989-10-01 | Well Fluid changed to Gas |
1989-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-12-23 | Perforation | 1515.50 | 1517.90 | 7 |
1974-02-16 | Acid Treatment | 1473.70 | 1475.50 | 0 |
1978-06-28 | Acid Treatment | 1515.50 | 1517.90 | 0 |
1973-12-31 | Acid Treatment | 1515.50 | 1517.90 | 0 |
1974-01-03 | Acid Treatment | 1515.50 | 1517.90 | 0 |
1974-01-07 | Fracture | 1515.50 | 1517.90 | 0 |
1974-01-11 | Perforation | 957.70 | 962.60 | 7 |
1974-01-14 | Acid Treatment | 957.70 | 962.60 | 0 |
1974-01-18 | Perforation | 1473.70 | 1475.50 | 7 |
1974-01-19 | Acid Treatment | 1473.70 | 1475.50 | 0 |
1974-01-20 | Cement Squeeze | 957.70 | 962.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 1534 | 0.0 | 0.0 | 0.0 |
1981 | 1408 | 0.0 | 0.0 | 0.0 |
1983 | 1535 | 0.0 | 0.0 | 0.0 |
1988 | 809 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1973-11-08 | Lost Circulation | 30.80 | 30.80 |
1973-11-11 | Lost Circulation | 239.00 | 239.00 |
For data sources see[6]