X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826050906000

Well Details

Well ID: 0826050906000
Loading map...
Location: 00/06-09-082-05W6/0
Location Alias: 00/06-09-82-05 W6M
Location Alias 2: 00/06-09-082-05 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 05
Section: 09
County/Municipality: Municipal District of Fairview No. 136
Well Name: NORWEST ET AL DUNVEGAN 6-9-82-5
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0049333
License Date: 1974-03-13
License Status: RecCertified
Spud Date: 1974-03-19
Final Drill Date: 1974-04-04
Well Total Depth: 1667.30 m
Surface Hole Latitude: 56.091183
Surface Hole Longitude: -118.723903

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-13 Obtained License
1974-04-04 Finished Drilling
1974-04-06 Drill Stem Test Performed
1974-04-07 Drill Stem Test Performed
1974-04-09 Production Casing Operation Performed
1974-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-14 Perforation Treatment Performed - Jet Perforation
1974-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-18 Perforation Treatment Performed - Acid Wash - No Pressure
1974-09-18 Perforation Treatment Performed - Jet Perforation
1974-10-23 Well Mode changed to Drilled and Cased
1978-04-25 Well Began Production
1978-04-25 Well Fluid changed to Gas
1978-04-25 Well Mode changed to Flowing
1980-01-01 Well Fluid changed to Gas
1980-01-01 Well Mode changed to Suspended
1984-05-17 Well Fluid changed to Gas
1984-05-17 Well Mode changed to Flowing
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Suspended
1996-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-14 Plug Back Performed
1996-03-15 Well Abandoned
1996-03-15 Well Fluid changed to Gas
1996-03-15 Well Mode changed to Abandoned
1996-10-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-14 Perforation 901.60 902.80 7
1974-09-14 Perforation 902.80 905.90 7
1974-09-14 Acid Treatment 901.60 905.90 0
1974-09-16 Acid Treatment 901.60 905.90 0
1974-09-18 Perforation 900.40 901.60 7
1974-09-18 Acid Wash 900.40 901.60 0
1974-09-18 Acid Treatment 900.40 901.60 0
1996-03-14 Packing Device Capped w/Cement 884.50 893.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 770 0.0 0.0 0.0
1984 1915 0.0 0.0 0.0

For data sources see[5]

References