X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826071012020

Well Details

Well ID: 0826071012020
Loading map...
Location: 02/12-10-082-07W6/0
Location Alias: 02/12-10-82-07 W6M
Location Alias 2: 02/12-10-082-07 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 07
Section: 10
County/Municipality: Saddle Hills County
Well Name: CEQUENCE 102 BLUEB 12-10-82-7
Operator Name: Cequence Energy Ltd.
License Number: 0212675
License Date: 1998-01-27
License Status: Abandoned
Spud Date: 1998-02-02
Final Drill Date: 1998-02-12
Well Total Depth: 1681.00 m
Surface Hole Latitude: 56.095297
Surface Hole Longitude: -119.015982

For data sources see[1][2]

Well History

Date Event
1998-01-27 Obtained License
1998-02-03 Surface Casing Operation Performed
1998-02-07 Drill Stem Test Performed
1998-02-12 Drill Stem Test Performed
1998-02-12 Finished Drilling
1998-02-12 Well Log Performed
1998-02-12 Well Mode changed to Drilled and Cased
1998-02-13 Drill Stem Test Performed
1998-02-15 Production Casing Operation Performed
1998-02-15 Rig Released
1998-03-06 Perforation Treatment Performed - Jet Perforation
1998-03-06 Well Log Performed
1998-03-08 Well Log Performed
1998-03-09 Well Log Performed
1998-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-10 Perforation Treatment Performed - Jet Perforation
1998-03-10 Well Log Performed
1998-03-21 Well Log Performed
1998-03-22 Perforation Treatment Performed - Jet Perforation
1998-03-22 Well Log Performed
1998-03-23 Perforation Treatment Performed - Jet Perforation
1998-03-23 Well Log Performed
1998-03-24 Perforation Treatment Performed - Jet Perforation
1998-03-25 Well Log Performed
1998-04-18 Perforation Treatment Performed - Fractured
1998-04-28 Well Log Performed
1998-05-01 Well Log Performed
1998-05-02 Perforation Treatment Performed - Jet Perforation
1998-06-06 Well Began Production
1998-06-06 Well Fluid changed to Gas
1998-06-06 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2005-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-28 Plug Back Performed
2005-10-28 Well Fluid changed to Gas
2005-10-28 Well Mode changed to Abandoned Zone
2005-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-29 Plug Back Performed
2005-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-30 Plug Back Performed
2005-10-30 Well Log Performed
2005-10-31 Perforation Treatment Performed - Cement Squeeze
2005-10-31 Plug Back Performed
2005-11-03 Perforation Treatment Performed - Jet Perforation
2005-11-03 Well Log Performed
2005-11-05 Perforation Treatment Performed - Fractured
2005-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-09 Perforation Treatment Performed - Jet Perforation
2005-11-09 Plug Back Performed
2005-11-09 Well Log Performed
2005-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-14 Plug Back Performed
2005-11-14 Well Log Performed
2015-10-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-06 Perforation 1599.00 1600.00 13
1998-05-02 Perforation 575.00 577.00 18
2005-10-28 Packing Device Capped w/Cement 1544.00 1552.00 0
2005-10-29 Packing Device Capped w/Cement 980.00 988.00 0
2005-10-30 Packing Device Capped w/Cement 955.00 963.00 0
2005-10-30 Packing Device Capped w/Cement 937.00 945.00 0
2005-10-31 Cement Squeeze 575.00 577.00 0
2005-11-03 Perforation 619.00 620.00 13
2005-11-05 Fracture 619.00 620.00 0
2005-11-09 Packing Device Capped w/Cement 562.00 570.00 0
2005-11-09 Packing Device Capped w/Cement 606.00 614.00 0
1998-03-06 Perforation 1602.00 1603.00 13
2005-11-09 Perforation 550.00 552.00 26
2005-11-14 Packing Device Capped w/Cement 538.00 545.00 0
1998-03-10 Packing Device Capped w/Cement 1587.00 1595.00 0
1998-03-10 Perforation 1558.50 1559.50 14
1998-03-10 Perforation 1560.00 1562.00 14
1998-03-22 Perforation 995.00 996.00 14
1998-03-23 Perforation 968.00 969.50 14
1998-03-24 Perforation 952.50 956.00 18
1998-04-18 Fracture 952.50 969.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4113 0.0 0.0 0.0
1999 7504 0.0 0.0 0.0
2000 8734 0.0 0.0 0.0
2001 8740 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 124 0.0 0.0 0.0
2004 4192 0.0 0.0 0.0
2005 2330 0.0 0.0 0.0

For data sources see[5]

References