X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826071611004

Well Details

Well ID: 0826071611004
Loading map...
Location: 00/11-16-082-07W6/4
Location Alias: 00/11-16-82-07 W6M
Location Alias 2: 00/11-16-082-07 W6/04
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 07
Section: 16
County/Municipality: Saddle Hills County
Well Name: CEQUENCE BLUEB 11-16-82-7
Operator Name: Cequence Energy Ltd.
License Number: 0048123
License Date: 1973-11-23
License Status: Abandoned
Spud Date: 1973-11-29
Final Drill Date: 1973-12-24
Well Total Depth: 2243.90 m
Surface Hole Latitude: 56.111703
Surface Hole Longitude: -119.036537

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-11-23 Obtained License
1973-12-24 Finished Drilling
1973-12-24 Well Mode changed to Drilled and Cased
1973-12-28 Production Casing Operation Performed
1974-06-10 Perforation Treatment Performed - Jet Perforation
1974-06-11 Drill Stem Test Performed
1974-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-06-14 Perforation Treatment Performed - Jet Perforation
1974-06-16 Perforation Treatment Performed - Cement Squeeze
1974-06-17 Perforation Treatment Performed - Cement Squeeze
1974-06-17 Perforation Treatment Performed - Jet Perforation
1974-06-18 Perforation Treatment Performed - Jet Perforation
1974-06-19 Perforation Treatment Performed - Jet Perforation
1974-06-20 Perforation Treatment Performed - Jet Perforation
1974-06-21 Perforation Treatment Performed - Jet Perforation
1974-06-24 Perforation Treatment Performed - Cement Squeeze
1974-06-25 Perforation Treatment Performed - Cement Squeeze
1985-06-06 Well Log Performed
1985-06-20 Perforation Treatment Performed - Jet Perforation
1985-06-21 Perforation Treatment Performed - Cement Squeeze
1997-02-17 Well Log Performed
1997-02-18 Well Log Performed
1999-06-22 Well Log Performed
1999-06-23 Well Log Performed
1999-06-24 Perforation Treatment Performed - Jet Perforation
1999-06-30 Perforation Treatment Performed - Fractured
1999-07-09 Well Log Performed
2008-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-11 Perforation Treatment Performed - Cement Squeeze
2008-01-11 Plug Back Performed
2008-01-13 Perforation Treatment Performed - Jet Perforation
2008-01-14 Perforation Treatment Performed - Fractured
2008-06-18 Well Began Production
2008-06-18 Well Fluid changed to Gas
2008-06-18 Well Mode changed to Flowing
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Suspended
2016-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-17 Plug Back Performed
2016-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-18 Plug Back Performed
2016-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-19 Plug Back Performed
2016-06-19 Well Fluid changed to Gas
2016-06-19 Well Log Performed
2016-06-19 Well Mode changed to Abandoned Zone
2016-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-20 Plug Back Performed
2016-06-22 Well Abandoned
2016-06-22 Well Fluid changed to Gas
2016-06-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-06-10 Perforation 2206.80 2212.80 3
1974-06-21 Perforation 1156.40 1157.00 13
1974-06-24 Cement Squeeze 1156.40 1157.00 0
1974-06-25 Cement Squeeze 1156.40 1157.00 0
1985-06-20 Perforation 1578.90 1584.40 13
1985-06-20 Perforation 1571.20 1575.80 13
1985-06-21 Cement Squeeze 1440.50 1452.10 0
1999-06-24 Perforation 1226.50 1229.50 17
1999-06-24 Perforation 1231.40 1239.40 17
1999-06-30 Fracture 1226.50 1239.40 0
2008-01-11 Packing Device Capped w/Cement 1434.00 1436.00 0
1974-06-14 Packing Device Capped w/Cement 2188.50 2194.60 0
2008-01-11 Cement Squeeze 1226.50 1229.50 0
2008-01-11 Cement Squeeze 1231.40 1239.40 0
2008-01-13 Perforation 1420.50 1426.50 8
2008-01-14 Fracture 1420.50 1426.50 0
2016-06-17 Packing Device Capped w/Cement 1538.00 1546.00 0
2016-06-18 Packing Device Capped w/Cement 1429.00 1437.00 0
2016-06-19 Packing Device Capped w/Cement 1405.00 1413.00 0
2016-06-20 Packing Device Capped w/Cement 1213.00 1221.00 0
2016-06-20 Packing Device Capped w/Cement 1142.00 1150.00 0
1974-06-14 Perforation 1624.60 1627.60 7
1974-06-16 Cement Squeeze 1624.60 1627.60 0
1974-06-17 Cement Squeeze 1624.60 1627.60 0
1974-06-17 Perforation 1588.00 1591.70 7
1974-06-18 Perforation 1575.80 1578.90 7
1974-06-19 Perforation 1449.30 1452.10 7
1974-06-20 Perforation 1440.50 1446.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4594 0.0 0.0 0.0
2009 8419 0.0 0.0 0.0
2010 2354 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References