X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826082516002

Well Details

Well ID: 0826082516002
Loading map...
Location: 00/16-25-082-08W6/2
Location Alias: 00/16-25-82-08 W6M
Location Alias 2: 00/16-25-082-08 W6/02
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 08
Section: 25
County/Municipality: Saddle Hills County
Well Name: VELO ET AL MULLIGAN 16-25-82-8
Operator Name: Cequence Energy Ltd.
License Number: 0358392
License Date: 2006-06-06
License Status: Abandoned
Spud Date: 2006-06-17
Final Drill Date: 2006-07-19
Well Total Depth: 1541.90 m
Surface Hole Latitude: 56.145156
Surface Hole Longitude: -119.094591

For data sources see[1][2]

Well History

Date Event
2006-06-06 Obtained License
2006-06-18 Surface Casing Operation Performed
2006-06-30 Direction Drilling Operation Performed - Sidetrack Fish
2006-07-06 Production Casing Operation Performed
2006-07-06 Well Mode changed to Drilled and Cased
2006-07-07 Rig Released
2006-07-19 Finished Drilling
2006-07-19 Perforation Treatment Performed - Open-Hole Completion
2006-07-22 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Plug Back Performed
2006-07-25 Well Mode changed to Abandoned Zone
2006-09-17 Well Began Production
2006-09-17 Well Fluid changed to Gas
2006-09-17 Well Mode changed to Flowing
2007-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-04-09 Perforation Treatment Performed - Jet Perforation
2007-04-09 Plug Back Performed
2007-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-04-10 Plug Back Performed
2007-08-01 Well Fluid changed to Gas
2007-08-01 Well Mode changed to Suspended
2008-03-27 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-06-30 330.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-19 Open Hole/Barefoot Completion 1535.00 1541.90 0
2006-07-22 Perforation 1062.50 1064.50 17
2006-07-22 Perforation 1060.50 1062.50 17
2006-07-25 Packing Device Capped w/Cement 1447.00 1455.00 0
2007-04-09 Packing Device Capped w/Cement 1046.80 1055.00 0
2007-04-09 Perforation 1040.00 1042.00 17
2007-04-10 Packing Device Capped w/Cement 1030.00 1038.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 720 0.0 0.0 0.0

For data sources see[6]

References