If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0826121813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.098978,"lon":-119.852351,"icon":""}]} |
| Location: 00/13-18-082-12W6/0 | |
| Location Alias: 00/13-18-82-12 W6M | |
| Location Alias 2: 00/13-18-082-12 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 082 | |
| Meridian: 6 | |
| Range: 12 | |
| Section: 18 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ BONANZA 13-18-82-12 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0471360 | |
| License Date: 2014-11-13 | |
| License Status: Suspension | |
| Spud Date: 2014-12-08 | |
| Final Drill Date: 2014-12-23 | |
| Well Total Depth: 3846.00 m | |
| Surface Hole Latitude: 56.098978 | |
| Surface Hole Longitude: -119.852351 |
| Date | Event |
|---|---|
| 2014-11-13 | Obtained License |
| 2014-12-09 | Lost Circulation Occurred |
| 2014-12-10 | Surface Casing Operation Performed |
| 2014-12-14 | Direction Drilling Operation Performed - Deviate |
| 2014-12-15 | Direction Drilling Operation Performed - Horizontal |
| 2014-12-16 | Well Log Performed |
| 2014-12-17 | Intermediate Casing Operation Performed |
| 2014-12-23 | Finished Drilling |
| 2014-12-23 | Well Mode changed to Drilled and Cased |
| 2014-12-24 | Liner Casing Operation Performed |
| 2014-12-24 | Well Log Performed |
| 2014-12-26 | Rig Released |
| 2015-01-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2015-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-07-07 | Well Began Production |
| 2015-07-07 | Well Fluid changed to Crude Oil |
| 2015-07-07 | Well Mode changed to Flowing |
| 2016-03-28 | Well Fluid changed to Crude Oil |
| 2016-03-28 | Well Mode changed to Suspended |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-08 | Beaver Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-12-14 | 1488.00 | Deviate (5 - 79 degrees) |
| 2014-12-15 | 1853.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-01-12 | Multi-Stage Fracture | 3798.50 | 3798.60 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3218.20 | 3218.30 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3149.10 | 3149.20 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3066.70 | 3066.80 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 2997.70 | 2997.80 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 2928.70 | 2928.80 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 2846.30 | 2846.40 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 2777.20 | 2777.30 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 2708.20 | 2708.30 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2625.80 | 2625.90 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2556.70 | 2556.80 | 0 |
| 2015-01-12 | Acid Treatment | 3798.50 | 3798.60 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2487.90 | 2488.00 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2405.50 | 2405.60 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2336.50 | 2336.60 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2267.70 | 2267.80 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2185.50 | 2185.60 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2103.10 | 2103.20 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 2034.20 | 2034.30 | 0 |
| 2015-01-15 | Multi-Stage Fracture | 1951.80 | 1951.90 | 0 |
| 2015-01-13 | Multi-Stage Fracture | 3741.30 | 3741.40 | 0 |
| 2015-01-13 | Multi-Stage Fracture | 3672.20 | 3672.30 | 0 |
| 2015-01-13 | Multi-Stage Fracture | 3590.00 | 3590.10 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3521.10 | 3521.20 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3452.00 | 3452.10 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3369.60 | 3369.70 | 0 |
| 2015-01-14 | Multi-Stage Fracture | 3287.20 | 3287.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-01-12 | 2015-01-15 | 1,748 | 7,970 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 85.6996 | N/A | |||
| PowerProp (40/70) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 1.4232 | N/A | ||
| Hexamethylenetetramine | 100-97-0 | 100 | 1.4232 | N/A | ||||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 1.4232 | N/A | ||||
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 11.2155 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 11.2155 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 11.2155 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 11.2155 | N/A | ||||
| Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.4232 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.4232 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.4232 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.4233 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0129 | N/A | |
| Water | 7732-18-5 | 100 | 0.0129 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0936 | N/A | |
| Water | 7732-18-5 | 100 | 0.0936 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0476 | N/A | |
| CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0839 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0839 | N/A | ||||
| Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0839 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0839 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-01-10 | 2015-01-11 | Surface Water - Runoff | 3985 |
| 2015-01-13 | 2015-01-14 | Surface Water - Runoff | 3985 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 216 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-09 | Lost Circulation | 157.00 | 443.00 |
| 2015-02-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]