If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0836071909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.208595,"lon":-119.118503,"icon":""}]} |
| Location: 00/09-19-083-07W6/0 | |
| Location Alias: 00/09-19-83-07 W6M | |
| Location Alias 2: 00/09-19-083-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 083 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 19 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ CECIL 9-19-83-7 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0485432 | |
| License Date: 2017-09-14 | |
| License Status: Issued | |
| Spud Date: 2017-09-24 | |
| Final Drill Date: 2017-10-01 | |
| Well Total Depth: 3220.00 m | |
| Surface Hole Latitude: 56.208595 | |
| Surface Hole Longitude: -119.118503 |
| Date | Event |
|---|---|
| 2017-09-14 | Obtained License |
| 2017-09-25 | Surface Casing Operation Performed |
| 2017-09-26 | Direction Drilling Operation Performed - Deviate |
| 2017-09-27 | Direction Drilling Operation Performed - Horizontal |
| 2017-09-28 | Intermediate Casing Operation Performed |
| 2017-10-01 | Finished Drilling |
| 2017-10-01 | Well Log Performed |
| 2017-10-01 | Well Mode changed to Drilled and Cased |
| 2017-10-02 | Liner Casing Operation Performed |
| 2017-10-02 | Well Log Performed |
| 2017-10-03 | Rig Released |
| 2017-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-23 | Well Began Production |
| 2017-11-23 | Well Fluid changed to Crude Oil |
| 2017-11-23 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-09-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-09-26 | 871.70 | Deviate (5 - 79 degrees) |
| 2017-09-27 | 1281.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-11-04 | Multi-Stage Fracture | 3177.40 | 3177.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2601.00 | 2601.10 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2524.30 | 2524.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2447.40 | 2447.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2370.50 | 2370.60 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2293.70 | 2293.80 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2217.00 | 2217.10 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2140.30 | 2140.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2063.80 | 2063.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1987.40 | 1987.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1910.20 | 1910.30 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3114.80 | 3114.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1834.00 | 1834.10 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1756.80 | 1756.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1680.00 | 1680.10 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1603.20 | 1603.30 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1526.10 | 1526.20 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1449.80 | 1449.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 1373.40 | 1373.50 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 3051.70 | 3051.80 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2989.00 | 2989.10 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2926.50 | 2926.60 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2864.50 | 2864.60 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2802.70 | 2802.80 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2740.30 | 2740.40 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2677.60 | 2677.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-11-04 | 2017-11-04 | 1,161 | 1,662 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 89.0541 | N/A | |||
| Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 10.2655 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 10.2655 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 10.2655 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 10.2655 | N/A | ||||
| TurboProp (30/50) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 9.5641 | N/A | ||
| Water-soluble polymer | Not Available | 100 | 9.5641 | N/A | ||||
| AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.013 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.013 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.013 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.013 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.013 | N/A | ||||
| CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.1031 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1031 | N/A | ||||
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0435 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0435 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0435 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0435 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0435 | N/A | ||||
| Nitrogen Gas | Canyon Technical Services | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.871 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.8711 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0593 | N/A | |
| SS-9 Surfactant | Canyon Technical Services | Surfactant | No specific ingredients | Not Available | 100 | 0.0216 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-11-03 | 2017-11-04 | Surface Water - Runoff | 1680 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 904 | 0.0 | 0.0 | 0.0 |
| 2018 | 963 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-10-01 | No Incident Encountered | 0.00 | 0.00 |
| 2017-11-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]