X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0836080911000

Well Details

Well ID: 0836080911000
Loading map...
Location: 00/11-09-083-08W6/0
Location Alias: 00/11-09-83-08 W6M
Location Alias 2: 00/11-09-083-08 W6/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 6
Range: 08
Section: 09
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ CECIL 11-9-83-8
Operator Name: Tourmaline Oil Corp.
License Number: 0486260
License Date: 2017-11-14
License Status: Issued
Spud Date: 2018-01-03
Final Drill Date: 2018-01-10
Well Total Depth: 3118.00 m
Surface Hole Latitude: 56.184095
Surface Hole Longitude: -119.172776

For data sources see[1][2]

Well History

Date Event
2017-11-14 Obtained License
2018-01-04 Lost Circulation Occurred
2018-01-04 Surface Casing Operation Performed
2018-01-06 Direction Drilling Operation Performed - Deviate
2018-01-06 Direction Drilling Operation Performed - Horizontal
2018-01-07 Intermediate Casing Operation Performed
2018-01-10 Finished Drilling
2018-01-10 Well Log Performed
2018-01-10 Well Mode changed to Drilled and Cased
2018-01-11 Liner Casing Operation Performed
2018-01-12 Rig Released
2018-02-02 Well Log Performed
2018-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-16 Well Began Production
2018-02-16 Well Fluid changed to Crude Oil
2018-02-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-03 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-06 911.50 Deviate (5 - 79 degrees)
2018-01-06 1342.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-06 Multi-Stage Fracture 3078.20 3078.30 0
2018-02-06 Multi-Stage Fracture 2490.80 2490.90 0
2018-02-06 Multi-Stage Fracture 2417.20 2417.30 0
2018-02-06 Multi-Stage Fracture 2358.10 2358.20 0
2018-02-06 Multi-Stage Fracture 2284.80 2284.90 0
2018-02-06 Multi-Stage Fracture 2226.00 2226.10 0
2018-02-06 Multi-Stage Fracture 2153.10 2153.20 0
2018-02-06 Multi-Stage Fracture 2094.40 2094.50 0
2018-02-06 Multi-Stage Fracture 2021.80 2021.90 0
2018-02-06 Multi-Stage Fracture 1963.40 1963.50 0
2018-02-06 Multi-Stage Fracture 1891.50 1891.60 0
2018-02-06 Multi-Stage Fracture 3019.10 3019.20 0
2018-02-06 Multi-Stage Fracture 1833.30 1833.40 0
2018-02-06 Multi-Stage Fracture 1760.60 1760.70 0
2018-02-06 Multi-Stage Fracture 1702.20 1702.30 0
2018-02-06 Multi-Stage Fracture 1628.80 1628.90 0
2018-02-06 Multi-Stage Fracture 1570.60 1570.70 0
2018-02-06 Multi-Stage Fracture 1497.30 1497.40 0
2018-02-06 Multi-Stage Fracture 1424.00 1424.10 0
2018-02-06 Multi-Stage Fracture 2946.00 2946.10 0
2018-02-06 Multi-Stage Fracture 2887.60 2887.70 0
2018-02-06 Multi-Stage Fracture 2814.10 2814.20 0
2018-02-06 Multi-Stage Fracture 2755.10 2755.20 0
2018-02-06 Multi-Stage Fracture 2681.60 2681.70 0
2018-02-06 Multi-Stage Fracture 2622.70 2622.80 0
2018-02-06 Multi-Stage Fracture 2549.90 2550.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-06 2018-02-06 1,180 4,320 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.7273 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 5.0234 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.1366 N/A
SiberProp 20/40 Trican silica crystalline 14808-60-7 100 4.8223 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0091 N/A
dibromoacetonitrile 3252-43-5 100 0.0091 N/A
non-hazardous ingredients Not Available 100 0.0091 N/A
polyethylene glycol 25322-68-3 100 0.0091 N/A
sodium bromide 7647-15-6 100 0.0091 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0996 N/A
non-hazardous ingredients Not Available 100 0.0996 N/A
FR-23 Trican Friction Reducer acrylamide modified polymer Trade Secret 100 0.0524 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0524 N/A
non-hazardous ingredients Not Available 100 0.0524 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0425 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0864 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0864 N/A
methanol 67-56-1 100 0.0864 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0864 N/A
non-hazardous ingredients Not Available 100 0.0864 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-06 2018-02-07 Surface Water - Runoff 4320

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6809 0.0 0.0 0.0
2019 7093 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-04 Lost Circulation 113.00 280.00
2018-02-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References