If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0836081109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.193098,"lon":-119.166546,"icon":""}]} |
| Location: 00/09-11-083-08W6/0 | |
| Location Alias: 00/09-11-83-08 W6M | |
| Location Alias 2: 00/09-11-083-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 083 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 11 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ CECIL 9-11-83-8 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0485289 | |
| License Date: 2017-09-06 | |
| License Status: Issued | |
| Spud Date: 2017-10-07 | |
| Final Drill Date: 2017-10-21 | |
| Well Total Depth: 3192.00 m | |
| Surface Hole Latitude: 56.193098 | |
| Surface Hole Longitude: -119.166546 |
| Date | Event |
|---|---|
| 2017-09-06 | Obtained License |
| 2017-10-08 | Surface Casing Operation Performed |
| 2017-10-16 | Direction Drilling Operation Performed - Deviate |
| 2017-10-17 | Direction Drilling Operation Performed - Horizontal |
| 2017-10-18 | Intermediate Casing Operation Performed |
| 2017-10-21 | Finished Drilling |
| 2017-10-21 | Liner Casing Operation Performed |
| 2017-10-21 | Well Log Performed |
| 2017-10-21 | Well Mode changed to Drilled and Cased |
| 2017-10-22 | Rig Released |
| 2017-11-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-09 | Well Began Production |
| 2017-12-09 | Well Fluid changed to Crude Oil |
| 2017-12-09 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-10-07 | Precision Drilling Corporation | 533 | N/A | Set Surface |
| 2017-10-19 | Precision Drilling Corporation | 533 | N/A | Resumption |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-10-16 | 860.40 | Deviate (5 - 79 degrees) |
| 2017-10-17 | 1310.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-11-13 | Multi-Stage Fracture | 3164.80 | 3164.90 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2641.60 | 2641.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2583.40 | 2583.50 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2524.90 | 2525.00 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2466.80 | 2466.90 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2408.30 | 2408.40 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2350.30 | 2350.40 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2292.20 | 2292.30 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2233.60 | 2233.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2174.80 | 2174.90 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2102.00 | 2102.10 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 3106.60 | 3106.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2029.60 | 2029.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1957.00 | 1957.10 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1883.60 | 1883.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1812.70 | 1812.80 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1740.00 | 1740.10 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1666.80 | 1666.90 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 1593.60 | 1593.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 3049.70 | 3049.80 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2991.00 | 2991.10 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2933.20 | 2933.30 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2874.60 | 2874.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2816.60 | 2816.70 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2758.10 | 2758.20 | 0 |
| 2017-11-13 | Multi-Stage Fracture | 2699.60 | 2699.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-11-13 | 2017-11-13 | 1,168 | 3,841 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 88.9575 | N/A | |||
| Sand - Tier 1 (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.117 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.117 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.117 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.117 | N/A | ||||
| Sand - Tier 2 (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.2294 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.2294 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.2294 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.2294 | N/A | ||||
| SiberProp (20/40) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 4.4087 | N/A | ||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 4.4087 | N/A | ||||
| AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0112 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0112 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0112 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0112 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0112 | N/A | ||||
| CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.0986 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0986 | N/A | ||||
| CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0864 | N/A | |
| Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0864 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0864 | N/A | ||||
| Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0864 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0864 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.048 | N/A | |
| SI-18 (Scale Inhibitor) | Trican Well Service | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0428 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-11-13 | 2017-11-14 | Surface Water - Runoff | 3840 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 513 | 0.0 | 0.0 | 0.0 |
| 2018 | 8079 | 0.0 | 0.0 | 0.0 |
| 2019 | 7364 | 0.0 | 0.0 | 0.0 |
| 2020 | 1685 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-10-21 | No Incident Encountered | 0.00 | 0.00 |
| 2017-11-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]