If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0836083205020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.221455,"lon":-119.231802,"icon":""}]} |
| Location: 02/05-32-083-08W6/0 | |
| Location Alias: 02/05-32-83-08 W6M | |
| Location Alias 2: 02/05-32-083-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 083 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 32 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ 102 CECIL 5-32-83-8 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0489663 | |
| License Date: 2018-06-21 | |
| License Status: Amended | |
| Spud Date: 2018-10-05 | |
| Final Drill Date: 2018-10-11 | |
| Well Total Depth: 2878.00 m | |
| Surface Hole Latitude: 56.221455 | |
| Surface Hole Longitude: -119.231802 |
| Date | Event |
|---|---|
| 2018-06-21 | Obtained License |
| 2018-10-06 | Surface Casing Operation Performed |
| 2018-10-07 | Direction Drilling Operation Performed - Deviate |
| 2018-10-08 | Direction Drilling Operation Performed - Horizontal |
| 2018-10-09 | Intermediate Casing Operation Performed |
| 2018-10-11 | Finished Drilling |
| 2018-10-11 | Well Log Performed |
| 2018-10-11 | Well Mode changed to Drilled and Cased |
| 2018-10-12 | Liner Casing Operation Performed |
| 2018-10-12 | Rig Released |
| 2018-10-25 | Well Log Performed |
| 2018-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2018-11-01 | Well Log Performed |
| 2018-12-01 | Well Began Production |
| 2018-12-01 | Well Fluid changed to Crude Oil |
| 2018-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-10-05 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-10-07 | 872.90 | Deviate (5 - 79 degrees) |
| 2018-10-08 | 1292.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-10-30 | Multi-Stage Fracture | 2861.00 | 2861.10 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2315.50 | 2315.60 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2256.30 | 2256.40 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2197.70 | 2197.80 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2139.10 | 2139.20 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2080.40 | 2080.50 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2021.40 | 2021.50 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1962.40 | 1962.50 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1903.60 | 1903.70 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1844.60 | 1844.70 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1785.80 | 1785.90 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2787.00 | 2787.10 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1726.70 | 1726.80 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1667.90 | 1668.00 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1609.00 | 1609.10 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1550.60 | 1550.70 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1491.50 | 1491.60 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 1432.90 | 1433.00 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2727.80 | 2727.90 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2668.90 | 2669.00 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2610.20 | 2610.30 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2551.20 | 2551.30 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2492.10 | 2492.20 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2433.10 | 2433.20 | 0 |
| 2018-10-30 | Multi-Stage Fracture | 2374.70 | 2374.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-10-30 | 2018-10-30 | 1,145 | 3,766 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 87.8207 | N/A | |||
| Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.8153 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.1954 | N/A | ||
| WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0151 | N/A | |
| FR-23 | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0751 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0751 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0751 | N/A | ||||
| PFC-3 | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0451 | N/A | |
| glycol ether | 10352 | 100 | 0.0451 | N/A | ||||
| petroleum distillates | 10352 | 100 | 0.0451 | N/A | ||||
| silicon compound | 10352 | 100 | 0.0451 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0329 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0329 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0329 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0329 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0329 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-10-30 | 2018-10-31 | Surface Water - Runoff | 2765 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2018 | 687 | 0.0 | 0.0 | 0.0 |
| 2019 | 6613 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-10-11 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]