X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0844062004AC0

Well Details

Well ID: 0844062004AC0
Loading map...
Location: AC/04-20-084-06W4/0
Location Alias: AC/04-20-84-06 W4M
Location Alias 2: AC/04-20-084-06 W4/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 4
Range: 06
Section: 20
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: NEXEN OPTI W NEWBY 4-20-84-6
Operator Name: CNOOC Petroleum North America ULC
License Number: 0427015
License Date: 2010-12-06
License Status: Abandoned
Spud Date: 2011-02-02
Final Drill Date: 2011-02-06
Well Total Depth: 294.30 m
Surface Hole Latitude: 56.291965
Surface Hole Longitude: -110.927307

For data sources see[1][2]

Well History

Date Event
2010-12-06 Obtained License
2011-02-03 Surface Casing Operation Performed
2011-02-06 Finished Drilling
2011-02-06 Well Log Performed
2011-02-06 Well Mode changed to Drilled and Cased
2011-02-08 Production Casing Operation Performed
2011-02-08 Rig Released
2011-02-20 Well Log Performed
2011-03-03 Perforation Treatment Performed - Fractured
2011-03-03 Perforation Treatment Performed - Jet Perforation
2011-03-04 Perforation Treatment Performed - Bridge Plug No Cement Required
2011-03-04 Perforation Treatment Performed - Fractured
2011-03-04 Perforation Treatment Performed - Jet Perforation
2011-03-04 Well Log Performed
2011-03-17 Perforation Treatment Performed - Cement Plug
2011-03-17 Plug Back Performed
2011-03-17 Well Mode changed to Abandoned Zone
2011-03-24 Well Abandoned
2011-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-03 Perforation 264.00 264.50 20
2011-03-17 Cement Plug 3.70 241.70 0
2011-03-03 Fracture 264.00 264.50 0
2011-03-04 Perforation 245.00 245.50 20
2011-03-04 Fracture 245.00 245.50 0
2011-03-04 Bridge Plug, No Cement 241.70 242.30 0
2011-03-04 Perforation 197.00 197.50 20
2011-03-04 Fracture 197.00 197.50 0
2011-03-04 Perforation 175.00 175.50 20
2011-03-04 Fracture 175.00 175.50 0

For data sources see[4]



References