If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0846081006003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.266341,"lon":-119.178197,"icon":""}]} |
| Location: 00/06-10-084-08W6/3 | |
| Location Alias: 00/06-10-84-08 W6M | |
| Location Alias 2: 00/06-10-084-08 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 084 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 10 | |
| County/Municipality: Saddle Hills County | |
| Well Name: CNRL ET AL CECIL 6-10-84-8 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0052571 | |
| License Date: 1975-01-21 | |
| License Status: Abandoned | |
| Spud Date: 1975-01-26 | |
| Final Drill Date: 1975-03-05 | |
| Well Total Depth: 2376.20 m | |
| Surface Hole Latitude: 56.266341 | |
| Surface Hole Longitude: -119.178197 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1975-01-21 | Obtained License |
| 1975-03-05 | Finished Drilling |
| 1975-03-05 | Well Log Performed |
| 1975-03-08 | Drill Stem Test Performed |
| 1975-03-09 | Drill Stem Test Performed |
| 1975-03-11 | Production Casing Operation Performed |
| 1975-03-14 | Drill Stem Test Performed |
| 1975-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-15 | Drill Stem Test Performed |
| 1975-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1975-03-15 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-16 | Drill Stem Test Performed |
| 1975-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1975-03-16 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1975-03-18 | Drill Stem Test Performed |
| 1975-03-18 | Perforation Treatment Performed - Jet Perforation |
| 1975-03-19 | Drill Stem Test Performed |
| 1977-02-07 | Perforation Treatment Performed - Jet Perforation |
| 1988-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-03-15 | Perforation Treatment Performed - Jet Perforation |
| 1988-03-15 | Plug Back Performed |
| 1988-03-15 | Well Log Performed |
| 1988-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-08-05 | Perforation Treatment Performed - Cement Squeeze |
| 1994-09-04 | Perforation Treatment Performed - Jet Perforation |
| 1994-09-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-09-05 | Plug Back Performed |
| 1994-09-06 | Perforation Treatment Performed - Jet Perforation |
| 1994-09-06 | Well Log Performed |
| 1994-09-06 | Well Mode changed to Drilled and Cased |
| 1994-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-06-26 | Well Log Performed |
| 1996-12-13 | Well Log Performed |
| 1996-12-14 | Well Log Performed |
| 1996-12-15 | Well Log Performed |
| 1996-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-16 | Plug Back Performed |
| 1996-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-17 | Perforation Treatment Performed - Cement Squeeze |
| 1996-12-17 | Plug Back Performed |
| 1996-12-17 | Well Log Performed |
| 1996-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-18 | Plug Back Performed |
| 1996-12-19 | Well Log Performed |
| 1996-12-20 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-20 | Well Log Performed |
| 1996-12-21 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-21 | Perforation Treatment Performed - Remedial Casing |
| 1996-12-21 | Well Log Performed |
| 1996-12-22 | Perforation Treatment Performed - Jet Perforation |
| 1996-12-22 | Perforation Treatment Performed - Remedial Casing |
| 1996-12-23 | Perforation Treatment Performed - Remedial Casing |
| 1997-01-03 | Well Fluid changed to Crude Oil |
| 1997-01-03 | Well Mode changed to Potential |
| 1997-01-04 | Well Abandoned |
| 1997-01-04 | Well Fluid changed to Crude Oil |
| 1997-01-04 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-03-14 | Perforation | 2303.10 | 2304.90 | 7 |
| 1975-03-15 | Perforation | 2092.50 | 2094.00 | 7 |
| 1975-03-16 | Packing Device Capped w/Cement | 2075.70 | 2075.70 | 0 |
| 1975-03-16 | Perforation | 1927.60 | 1929.40 | 7 |
| 1975-03-16 | Perforation | 1933.70 | 1936.10 | 7 |
| 1975-03-16 | Perforation | 1941.90 | 1948.00 | 7 |
| 1975-03-16 | Perforation | 1950.10 | 1955.00 | 7 |
| 1975-03-16 | Perforation | 1964.70 | 1967.20 | 7 |
| 1975-03-16 | Perforation | 1970.80 | 1973.30 | 7 |
| 1975-03-16 | Perforation | 1980.90 | 1993.10 | 7 |
| 1975-03-17 | Packing Device Capped w/Cement | 1912.60 | 1912.60 | 0 |
| 1975-03-14 | Perforation | 2310.40 | 2311.60 | 7 |
| 1975-03-18 | Perforation | 1600.20 | 1603.90 | 7 |
| 1975-03-18 | Perforation | 1588.60 | 1594.10 | 7 |
| 1977-02-07 | Perforation | 1594.10 | 1600.20 | 13 |
| 1988-03-15 | Packing Device Capped w/Cement | 1498.00 | 1506.00 | 0 |
| 1988-03-15 | Perforation | 1135.00 | 1139.00 | 13 |
| 1988-03-17 | Acid Treatment | 1135.00 | 1139.00 | 0 |
| 1994-08-05 | Cement Squeeze | 1135.00 | 1139.00 | 0 |
| 1994-09-04 | Perforation | 1588.60 | 1603.90 | 13 |
| 1994-09-05 | Packing Device Capped w/Cement | 1557.00 | 1575.00 | 0 |
| 1994-09-06 | Perforation | 1440.50 | 1460.50 | 13 |
| 1975-03-14 | Perforation | 2316.50 | 2322.60 | 7 |
| 1994-09-06 | Perforation | 1495.50 | 1505.00 | 13 |
| 1994-09-09 | Acid Treatment | 1440.50 | 1505.00 | 0 |
| 1994-09-10 | Acid Treatment | 1440.50 | 1505.00 | 0 |
| 1996-12-16 | Packing Device Capped w/Cement | 1390.80 | 1400.00 | 0 |
| 1996-12-17 | Cement Squeeze | 1135.00 | 1139.00 | 0 |
| 1996-12-17 | Packing Device Capped w/Cement | 1125.90 | 1130.00 | 0 |
| 1996-12-18 | Packing Device Capped w/Cement | 640.90 | 650.00 | 0 |
| 1996-12-20 | Perforation | 480.00 | 481.00 | 14 |
| 1996-12-21 | Remedial Casing Cementing | 480.00 | 481.00 | 0 |
| 1996-12-21 | Perforation | 450.00 | 451.00 | 14 |
| 1975-03-14 | Perforation | 2325.60 | 2328.10 | 7 |
| 1996-12-22 | Remedial Casing Cementing | 450.00 | 451.00 | 0 |
| 1996-12-22 | Perforation | 261.00 | 262.00 | 14 |
| 1996-12-23 | Remedial Casing Cementing | 261.00 | 262.00 | 0 |
| 1975-03-14 | Perforation | 2330.50 | 2332.90 | 7 |
| 1975-03-14 | Perforation | 2337.20 | 2339.00 | 7 |
| 1975-03-14 | Perforation | 2341.50 | 2344.50 | 7 |
| 1975-03-15 | Packing Device Capped w/Cement | 2293.60 | 2293.60 | 0 |
| 1975-03-15 | Perforation | 2089.40 | 2090.90 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]