If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0854073608150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.401928,"lon":-110.957984,"icon":""}]} |
Location: 15/08-36-085-07W4/0 | |
Location Alias: 15/08-36-85-07 W4M | |
Location Alias 2: 15/08-36-085-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 4 | |
Range: 07 | |
Section: 36 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: NEXEN OPTI 06P02 NEWBY 8-36-85-7 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0327407 | |
License Date: 2005-03-02 | |
License Status: Issued | |
Spud Date: 2005-03-06 | |
Final Drill Date: 2005-03-23 | |
Well Total Depth: 1330.00 m | |
Surface Hole Latitude: 56.401928 | |
Surface Hole Longitude: -110.957984 |
Date | Event |
---|---|
2005-03-02 | Obtained License |
2005-03-06 | Direction Drilling Operation Performed - Deviate |
2005-03-06 | Surface Casing Operation Performed |
2005-03-12 | Direction Drilling Operation Performed - Horizontal |
2005-03-12 | Well Log Performed |
2005-03-13 | Intermediate Casing Operation Performed |
2005-03-13 | Well Log Performed |
2005-03-16 | Well Log Performed |
2005-03-23 | Finished Drilling |
2005-03-23 | Well Log Performed |
2005-03-23 | Well Mode changed to Drilled and Cased |
2005-03-24 | Liner Casing Operation Performed |
2005-03-24 | Perforation Treatment Performed - Slotted Liner or Casing |
2005-03-24 | Rig Released |
2007-09-01 | Well Began Production |
2007-09-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-03-06 | 1.00 | Deviate (5 - 79 degrees) |
2005-03-12 | 325.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-03-24 | Slotted Liner | 409.20 | 1320.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 854 | 0.0 | 0.0 | 0.0 |
2008 | 7608 | 0.0 | 0.0 | 0.0 |
2009 | 5152 | 0.0 | 0.0 | 0.0 |
2010 | 8506 | 0.0 | 0.0 | 0.0 |
2011 | 8474 | 0.0 | 0.0 | 0.0 |
2012 | 7935 | 0.0 | 0.0 | 0.0 |
2013 | 7956 | 0.0 | 0.0 | 0.0 |
2014 | 8594 | 0.0 | 0.0 | 0.0 |
2015 | 7300 | 0.0 | 0.0 | 0.0 |
2016 | 6901 | 0.0 | 0.0 | 0.0 |
2017 | 7990 | 0.0 | 0.0 | 0.0 |
2018 | 8595 | 0.0 | 0.0 | 0.0 |
2019 | 8639 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[6]