X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855181609000

Well Details

Well ID: 0855181609000
Loading map...
Location: 00/09-16-085-18W5/0
Location Alias: 00/09-16-85-18 W5M
Location Alias 2: 00/09-16-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 16
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 9-16-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0107753
License Date: 1984-06-22
License Status: Abandoned
Spud Date: 1984-07-15
Final Drill Date: 1984-07-24
Well Total Depth: 666.00 m
Surface Hole Latitude: 56.372089
Surface Hole Longitude: -116.777281

For data sources see[1][2]

Well History

Date Event
1984-06-22 Obtained License
1984-07-16 Direction Drilling Operation Performed - Deviate
1984-07-17 Lost Circulation Occurred
1984-07-23 Well Log Performed
1984-07-24 Finished Drilling
1984-07-24 Production Casing Operation Performed
1984-07-25 Rig Released
1984-07-25 Well Log Performed
1984-07-25 Well Mode changed to Drilled and Cased
1985-09-17 Well Log Performed
1985-11-02 Perforation Treatment Performed - Jet Perforation
1987-01-16 Well Began Production
1987-01-16 Well Fluid changed to Crude Bitumen
1987-01-16 Well Mode changed to Pumping
1987-03-01 Well Fluid changed to Crude Bitumen
1987-03-01 Well Type changed to Cyclical
1999-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-16 Plug Back Performed
1999-04-16 Well Fluid changed to Crude Bitumen
1999-04-16 Well Mode changed to Suspended
1999-04-16 Well Type changed to Cyclical
2001-10-31 Well Abandoned
2001-10-31 Well Fluid changed to Crude Bitumen
2001-10-31 Well Mode changed to Abandoned
2001-10-31 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-07-16 185.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-02 Perforation 636.10 642.50 13
1999-04-16 Packing Device Capped w/Cement 587.50 601.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1443 0.0 0.0 0.0
1988 5243 0.0 0.0 0.0
1989 6644 0.0 0.0 0.0
1990 8154 0.0 0.0 0.0
1991 8742 0.0 0.0 0.0
1992 8729 0.0 0.0 0.0
1993 7903 0.0 0.0 0.0
1994 7659 0.0 0.0 0.0
1995 8456 0.0 0.0 0.0
1996 6269 0.0 0.0 0.0
1997 3527 0.0 0.0 0.0
1998 7092 0.0 0.0 0.0
1999 2150 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-07-17 Lost Circulation 215.00 280.00

For data sources see[7]

References