X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855181610130

Well Details

Well ID: 0855181610130
Loading map...
Location: 13/10-16-085-18W5/0
Location Alias: 13/10-16-85-18 W5M
Location Alias 2: 13/10-16-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 16
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 10-16-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0114655
License Date: 1985-05-16
License Status: Abandoned
Spud Date: 1985-06-21
Final Drill Date: 1985-06-23
Well Total Depth: 612.00 m
Surface Hole Latitude: 56.372517
Surface Hole Longitude: -116.777829

For data sources see[1][2]

Well History

Date Event
1985-05-16 Obtained License
1985-06-21 Direction Drilling Operation Performed - Deviate
1985-06-22 Lost Circulation Occurred
1985-06-23 Finished Drilling
1985-06-24 Production Casing Operation Performed
1985-06-24 Rig Released
1985-06-24 Well Log Performed
1985-09-01 Well Mode changed to Drilled and Cased
1985-09-16 Well Log Performed
1985-11-06 Perforation Treatment Performed - Jet Perforation
1987-01-16 Well Began Production
1987-01-16 Well Fluid changed to Crude Bitumen
1987-01-16 Well Mode changed to Pumping
1988-01-01 Well Fluid changed to Crude Bitumen
1988-01-01 Well Type changed to Cyclical
2000-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-22 Plug Back Performed
2000-06-22 Well Fluid changed to Crude Bitumen
2000-06-22 Well Mode changed to Abandoned Zone
2000-06-22 Well Type changed to Cyclical
2001-10-25 Well Abandoned
2001-10-25 Well Fluid changed to Crude Bitumen
2001-10-25 Well Mode changed to Abandoned
2001-10-25 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-06-21 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-06 Perforation 582.90 589.30 13
2000-06-22 Packing Device Capped w/Cement 544.00 556.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2390 0.0 0.0 0.0
1988 5967 0.0 0.0 0.0
1989 7360 0.0 0.0 0.0
1990 7673 0.0 0.0 0.0
1991 8749 0.0 0.0 0.0
1992 8749 0.0 0.0 0.0
1993 8084 0.0 0.0 0.0
1994 8658 0.0 0.0 0.0
1995 7690 0.0 0.0 0.0
1996 7344 0.0 0.0 0.0
1997 6632 0.0 0.0 0.0
1998 8059 0.0 0.0 0.0
1999 6953 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-22 Lost Circulation 268.00 268.00

For data sources see[7]

References