X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855181615050

Well Details

Well ID: 0855181615050
Loading map...
Location: 05/15-16-085-18W5/0
Location Alias: 05/15-16-85-18 W5M
Location Alias 2: 05/15-16-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 16
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 15-16-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0114553
License Date: 1985-05-13
License Status: Abandoned
Spud Date: 1985-07-27
Final Drill Date: 1985-07-29
Well Total Depth: 671.00 m
Surface Hole Latitude: 56.375950
Surface Hole Longitude: -116.783753

For data sources see[1][2]

Well History

Date Event
1985-05-13 Obtained License
1985-07-27 Direction Drilling Operation Performed - Deviate
1985-07-28 Lost Circulation Occurred
1985-07-29 Finished Drilling
1985-07-30 Production Casing Operation Performed
1985-07-30 Rig Released
1985-07-30 Well Log Performed
1985-08-10 Well Mode changed to Drilled and Cased
1985-09-12 Well Log Performed
1985-11-14 Perforation Treatment Performed - Jet Perforation
1987-01-16 Well Began Production
1987-01-16 Well Fluid changed to Crude Bitumen
1987-01-16 Well Mode changed to Pumping
1987-06-01 Well Fluid changed to Crude Bitumen
1987-06-01 Well Type changed to Cyclical
1999-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-13 Plug Back Performed
1999-07-13 Well Fluid changed to Crude Bitumen
1999-07-13 Well Mode changed to Abandoned Zone
1999-07-13 Well Type changed to Cyclical
2001-09-17 Well Abandoned
2001-09-17 Well Fluid changed to Crude Bitumen
2001-09-17 Well Mode changed to Abandoned
2001-09-17 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-07-27 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-14 Perforation 643.00 649.40 13
1999-07-13 Packing Device Capped w/Cement 596.50 611.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2923 0.0 0.0 0.0
1988 7461 0.0 0.0 0.0
1989 6740 0.0 0.0 0.0
1990 8377 0.0 0.0 0.0
1991 7524 0.0 0.0 0.0
1992 8732 0.0 0.0 0.0
1993 8164 0.0 0.0 0.0
1994 8676 0.0 0.0 0.0
1995 8546 0.0 0.0 0.0
1996 6647 0.0 0.0 0.0
1997 6671 0.0 0.0 0.0
1998 3020 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-07-28 Lost Circulation 196.00 302.00

For data sources see[7]

References