X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855181705000

Well Details

Well ID: 0855181705000
Loading map...
Location: 00/05-17-085-18W5/0
Location Alias: 00/05-17-85-18 W5M
Location Alias 2: 00/05-17-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 17
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 5-17-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0252773
License Date: 2001-03-12
License Status: Suspension
Spud Date: 2001-06-29
Final Drill Date: 2001-07-03
Well Total Depth: 674.00 m
Surface Hole Latitude: 56.372461
Surface Hole Longitude: -116.818768

For data sources see[1][2]

Well History

Date Event
2000-11-23 Conductor Casing Operation Performed
2001-03-12 Obtained License
2001-06-29 Direction Drilling Operation Performed - Deviate
2001-07-02 Well Log Performed
2001-07-03 Finished Drilling
2001-07-03 Production Casing Operation Performed
2001-07-03 Well Log Performed
2001-07-05 Well Log Performed
2001-07-12 Rig Released
2001-07-12 Well Mode changed to Drilled and Cased
2001-10-03 Well Began Production
2001-10-03 Well Fluid changed to Crude Bitumen
2001-10-03 Well Type changed to Cyclical
2002-07-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2006-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-02 Plug Back Performed
2011-10-01 Well Fluid changed to Crude Bitumen
2011-10-01 Well Mode changed to Suspended
2011-10-01 Well Type changed to Cyclical
2016-06-25 Perforation Treatment Performed - Cement Plug
2016-06-25 Plug Back Performed
2016-06-25 Well Fluid changed to Crude Bitumen
2016-06-25 Well Mode changed to Abandoned Zone
2016-06-25 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-06-29 65.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-03 Hydra Jet Perforation 622.70 624.40 50
2006-05-02 Packing Device Capped w/Cement 553.00 602.00 0
2016-06-25 Cement Plug 504.00 525.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 773 0.0 0.0 0.0
2002 6922 0.0 0.0 0.0
2003 6538 0.0 0.0 0.0
2004 7485 0.0 0.0 0.0
2005 6043 0.0 0.0 0.0
2006 1504 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References