X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855182102120

Well Details

Well ID: 0855182102120
Loading map...
Location: 12/02-21-085-18W5/0
Location Alias: 12/02-21-85-18 W5M
Location Alias 2: 12/02-21-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 21
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 2-21-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0112645
License Date: 1985-01-21
License Status: Abandoned
Spud Date: 1985-03-27
Final Drill Date: 1985-03-29
Well Total Depth: 611.00 m
Surface Hole Latitude: 56.378429
Surface Hole Longitude: -116.780936

For data sources see[1][2]

Well History

Date Event
1985-01-21 Obtained License
1985-03-27 Direction Drilling Operation Performed - Deviate
1985-03-29 Finished Drilling
1985-03-29 Production Casing Operation Performed
1985-03-29 Rig Released
1985-03-30 Well Log Performed
1985-05-20 Well Mode changed to Drilled and Cased
1985-06-28 Well Log Performed
1985-07-25 Perforation Treatment Performed - Jet Perforation
1987-01-16 Well Began Production
1987-01-16 Well Fluid changed to Crude Bitumen
1987-01-16 Well Mode changed to Pumping
1988-03-01 Well Fluid changed to Crude Bitumen
1988-03-01 Well Type changed to Cyclical
2001-04-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-25 Plug Back Performed
2001-04-25 Well Fluid changed to Crude Bitumen
2001-04-25 Well Mode changed to Abandoned Zone
2001-04-25 Well Type changed to Cyclical
2001-11-09 Well Abandoned
2001-11-09 Well Fluid changed to Crude Bitumen
2001-11-09 Well Mode changed to Abandoned
2001-11-09 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-03-27 51.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-25 Perforation 583.60 590.00 13
2001-04-25 Packing Device Capped w/Cement 545.00 557.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 6855 0.0 0.0 0.0
1988 3478 0.0 0.0 0.0
1989 6343 0.0 0.0 0.0
1990 5277 0.0 0.0 0.0
1991 8445 0.0 0.0 0.0
1992 8548 0.0 0.0 0.0
1993 8144 0.0 0.0 0.0
1994 5913 0.0 0.0 0.0
1995 4545 0.0 0.0 0.0
1996 5068 0.0 0.0 0.0
1997 8284 0.0 0.0 0.0
1998 8576 0.0 0.0 0.0
1999 8102 0.0 0.0 0.0
2000 8334 0.0 0.0 0.0
2001 1297 0.0 0.0 0.0

For data sources see[6]

References