X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855182107100

Well Details

Well ID: 0855182107100
Loading map...
Location: 10/07-21-085-18W5/0
Location Alias: 10/07-21-85-18 W5M
Location Alias 2: 10/07-21-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 21
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 7-21-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0113051
License Date: 1985-02-01
License Status: Abandoned
Spud Date: 1985-05-22
Final Drill Date: 1985-05-24
Well Total Depth: 636.00 m
Surface Hole Latitude: 56.383812
Surface Hole Longitude: -116.778102

For data sources see[1][2]

Well History

Date Event
1985-02-01 Obtained License
1985-05-22 Direction Drilling Operation Performed - Deviate
1985-05-24 Finished Drilling
1985-05-24 Production Casing Operation Performed
1985-05-24 Rig Released
1985-05-24 Well Log Performed
1985-05-29 Well Mode changed to Drilled and Cased
1985-07-08 Well Log Performed
1985-08-08 Perforation Treatment Performed - Jet Perforation
1986-10-14 Well Began Production
1986-10-14 Well Fluid changed to Crude Bitumen
1986-10-14 Well Mode changed to Pumping
1987-11-01 Well Fluid changed to Crude Bitumen
1987-11-01 Well Type changed to Cyclical
1999-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-31 Plug Back Performed
1999-07-31 Well Fluid changed to Crude Bitumen
1999-07-31 Well Mode changed to Suspended
1999-07-31 Well Type changed to Cyclical
1999-08-01 Well Fluid changed to Crude Bitumen
1999-08-01 Well Mode changed to Abandoned Zone
1999-08-01 Well Type changed to Cyclical
2002-10-25 Well Abandoned
2002-10-25 Well Fluid changed to Crude Bitumen
2002-10-25 Well Mode changed to Abandoned
2002-10-25 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-05-22 76.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-08 Perforation 595.60 602.00 13
1999-07-31 Packing Device Capped w/Cement 564.00 576.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 743 0.0 0.0 0.0
1987 1653 0.0 0.0 0.0
1988 7686 0.0 0.0 0.0
1989 7353 0.0 0.0 0.0
1990 7370 0.0 0.0 0.0
1991 8126 0.0 0.0 0.0
1992 8725 0.0 0.0 0.0
1993 7993 0.0 0.0 0.0
1994 8707 0.0 0.0 0.0
1995 8589 0.0 0.0 0.0
1996 7100 0.0 0.0 0.0
1997 8469 0.0 0.0 0.0
1998 8617 0.0 0.0 0.0
1999 1953 0.0 0.0 0.0

For data sources see[6]

References