X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855182114030

Well Details

Well ID: 0855182114030
Loading map...
Location: 03/14-21-085-18W5/0
Location Alias: 03/14-21-85-18 W5M
Location Alias 2: 03/14-21-085-18 W5/00
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 18
Section: 21
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 14-21-85-18
Operator Name: Canadian Natural Upgrading Limited
License Number: 0206729
License Date: 1997-09-30
License Status: Amended
Spud Date: 1997-11-05
Final Drill Date: 1997-11-09
Well Total Depth: 621.00 m
Surface Hole Latitude: 56.389909
Surface Hole Longitude: -116.783555

For data sources see[1][2]

Well History

Date Event
1997-09-30 Obtained License
1997-11-05 Direction Drilling Operation Performed - Deviate
1997-11-09 Finished Drilling
1997-11-09 Well Log Performed
1997-11-09 Well Mode changed to Drilled and Cased
1997-11-11 Production Casing Operation Performed
1997-11-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1997-11-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1997-11-23 Rig Released
1997-12-05 Well Log Performed
1998-04-19 Well Began Production
1998-04-19 Well Fluid changed to Crude Bitumen
1998-04-19 Well Type changed to Cyclical
2008-09-24 Well Fluid changed to Crude Bitumen
2008-09-24 Well Mode changed to Suspended
2008-09-24 Well Type changed to Cyclical
2013-05-14 Well Fluid changed to Crude Bitumen
2013-05-14 Well Type changed to Cyclical
2013-08-12 Well Fluid changed to Crude Bitumen
2013-08-12 Well Mode changed to Pumping
2013-08-13 Well Fluid changed to Crude Bitumen
2013-08-13 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-11-05 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-13 Hydra Jet Perforation 565.00 565.00 0
1997-11-18 Hydra Jet Perforation 563.00 563.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2985 0.0 0.0 0.0
1999 6645 0.0 0.0 0.0
2000 7534 0.0 0.0 0.0
2001 7913 0.0 0.0 0.0
2002 7213 0.0 0.0 0.0
2003 6191 0.0 0.0 0.0
2004 7143 0.0 0.0 0.0
2005 6167 0.0 0.0 0.0
2006 7427 0.0 0.0 0.0
2013 2560 0.0 0.0 0.0
2014 6011 0.0 0.0 0.0
2015 8555 0.0 0.0 0.0
2016 8601 0.0 0.0 0.0
2017 8614 0.0 0.0 0.0
2018 6614 0.0 0.0 0.0
2019 3785 0.0 0.0 0.0
2020 1572 0.0 0.0 0.0

For data sources see[6]

References