If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0855192514020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.404382,"lon":-116.8635,"icon":""}]} |
| Location: 02/14-25-085-19W5/0 | |
| Location Alias: 02/14-25-85-19 W5M | |
| Location Alias 2: 02/14-25-085-19 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 085 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 25 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: CNUL CADOTTE 14-25-85-19 | |
| Operator Name: Canadian Natural Upgrading Limited | |
| License Number: 0111511 | |
| License Date: 1984-12-10 | |
| License Status: Issued | |
| Spud Date: 1985-02-07 | |
| Final Drill Date: 1985-03-11 | |
| Well Total Depth: 1835.00 m | |
| Surface Hole Latitude: 56.404382 | |
| Surface Hole Longitude: -116.863500 |
| Date | Event |
|---|---|
| 1984-12-10 | Obtained License |
| 1985-02-08 | Lost Circulation Occurred |
| 1985-02-09 | Surface Casing Operation Performed |
| 1985-02-13 | Lost Circulation Occurred |
| 1985-03-04 | Well Log Performed |
| 1985-03-06 | Production Casing Operation Performed |
| 1985-03-06 | Well Log Performed |
| 1985-03-11 | Finished Drilling |
| 1985-03-11 | Perforation Treatment Performed - Open-Hole Completion |
| 1985-03-11 | Well Log Performed |
| 1985-03-12 | Well Log Performed |
| 1985-03-13 | Rig Released |
| 1985-03-13 | Well Mode changed to Drilled and Cased |
| 1986-05-29 | Well Log Performed |
| 1986-09-16 | Well Began Injection |
| 1986-09-16 | Well Fluid changed to Water |
| 1986-09-16 | Well Type changed to Injection |
| 1992-01-01 | Well Fluid changed to Water |
| 1992-01-01 | Well Type changed to Disposal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-03-11 | Open Hole/Barefoot Completion | 1530.00 | 1835.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2000 | 0 | 0.0 | 0.0 | 0.0 |
| 2001 | 0 | 0.0 | 0.0 | 0.0 |
| 2002 | 0 | 0.0 | 0.0 | 0.0 |
| 2003 | 0 | 0.0 | 0.0 | 0.0 |
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2010 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
| 2014 | 0 | 0.0 | 0.0 | 0.0 |
| 2015 | 0 | 0.0 | 0.0 | 0.0 |
| 2016 | 0 | 0.0 | 0.0 | 0.0 |
| 2017 | 0 | 0.0 | 0.0 | 0.0 |
| 2018 | 0 | 0.0 | 0.0 | 0.0 |
| 2019 | 0 | 0.0 | 0.0 | 0.0 |
| 2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1985-02-08 | Lost Circulation | 217.00 | 217.00 |
| 1985-02-13 | Lost Circulation | 575.00 | 881.00 |
For data sources see[6]