If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0856033506023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.411276,"lon":-118.35994,"icon":""}]} |
Location: 02/06-35-085-03W6/3 | |
Location Alias: 02/06-35-85-03 W6M | |
Location Alias 2: 02/06-35-085-03 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 085 | |
Meridian: 6 | |
Range: 03 | |
Section: 35 | |
County/Municipality: Clear Hills County | |
Well Name: RIDGEBK EXPL HINES 6-35-85-3 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0345008 | |
License Date: 2005-12-09 | |
License Status: Amended | |
Spud Date: 2005-12-19 | |
Final Drill Date: 2006-01-26 | |
Well Total Depth: 723.00 m | |
Surface Hole Latitude: 56.411276 | |
Surface Hole Longitude: -118.359940 |
Date | Event |
---|---|
2005-12-09 | Obtained License |
2005-12-19 | Surface Casing Operation Performed |
2005-12-22 | Production Casing Operation Performed |
2005-12-22 | Rig Released |
2006-01-19 | Well Log Performed |
2006-01-26 | Finished Drilling |
2006-01-26 | Perforation Treatment Performed - Open-Hole Completion |
2006-01-26 | Well Mode changed to Drilled and Cased |
2006-11-11 | Perforation Treatment Performed - Jet Perforation |
2006-11-11 | Well Log Performed |
2007-11-03 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2007-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-11-04 | Perforation Treatment Performed - Jet Perforation |
2007-11-04 | Well Log Performed |
2007-11-05 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-26 | Open Hole/Barefoot Completion | 715.00 | 723.00 | 0 |
2006-11-11 | Perforation | 91.00 | 93.00 | 17 |
2007-11-03 | Casing Patch | 91.00 | 93.00 | 0 |
2007-11-04 | Packing Device Capped w/Cement | 703.00 | 723.00 | 0 |
2007-11-04 | Perforation | 596.00 | 609.00 | 17 |
For data sources see[4]