X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865091805000

Well Details

Well ID: 0865091805000
Loading map...
Location: 00/05-18-086-09W5/0
Location Alias: 00/05-18-86-09 W5M
Location Alias 2: 00/05-18-086-09 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 09
Section: 18
County/Municipality: Swampy Lake 236
Well Name: HARVEST HZ LOON 5-18-86-9
Operator Name: Harvest Operations Corp.
License Number: 0415534
License Date: 2009-12-14
License Status: Amended
Spud Date: 2009-12-29
Final Drill Date: 2010-01-11
Well Total Depth: 1900.00 m
Surface Hole Latitude: 56.456744
Surface Hole Longitude: -115.433805

For data sources see[1][2]

Well History

Date Event
2009-12-14 Obtained License
2009-12-31 Surface Casing Operation Performed
2010-01-03 Direction Drilling Operation Performed - Horizontal
2010-01-06 Well Log Performed
2010-01-11 Finished Drilling
2010-01-11 Well Log Performed
2010-01-11 Well Mode changed to Drilled and Cased
2010-01-14 Well Log Performed
2010-01-26 Perforation Treatment Performed - Open-Hole Completion
2010-01-26 Production Casing Operation Performed
2010-01-26 Rig Released
2010-01-31 Well Log Performed
2010-02-01 Well Log Performed
2010-03-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-06 Perforation Treatment Performed - Fractured
2010-03-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-07 Perforation Treatment Performed - Fractured
2010-03-17 Well Began Production
2010-03-17 Well Fluid changed to Crude Oil
2010-03-17 Well Mode changed to Pumping
2010-04-10 Perforation Treatment Performed - Jet Perforation
2010-04-10 Perforation Treatment Performed - Remedial Casing
2010-04-10 Well Log Performed
2010-04-11 Perforation Treatment Performed - Jet Perforation
2010-04-11 Well Log Performed
2010-04-12 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-03 1090.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-26 Open Hole/Barefoot Completion 1784.00 1900.00 0
2010-03-07 Hydra Jet Perforation 1557.00 1558.00 0
2010-03-07 Fracture 1557.00 1558.00 0
2010-03-07 Hydra Jet Perforation 1474.00 1475.00 0
2010-03-07 Fracture 1474.00 1475.00 0
2010-04-10 Perforation 355.00 355.60 99
2010-04-10 Remedial Casing Cementing 355.00 355.60 0
2010-04-11 Perforation 300.00 300.60 99
2010-04-12 Remedial Casing Cementing 300.00 300.60 0
2010-03-06 Hydra Jet Perforation 1770.00 1771.00 0
2010-03-06 Fracture 1770.00 1771.00 0
2010-03-07 Hydra Jet Perforation 1705.00 1706.00 0
2010-03-07 Fracture 1705.00 1706.00 0
2010-03-07 Hydra Jet Perforation 1691.00 1692.00 0
2010-03-07 Fracture 1691.00 1692.00 0
2010-03-07 Hydra Jet Perforation 1635.00 1636.00 0
2010-03-07 Fracture 1635.00 1636.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5948 0.0 0.0 0.0
2011 8511 0.0 0.0 0.0
2012 7746 0.0 0.0 0.0
2013 7564 0.0 0.0 0.0
2014 7639 0.0 0.0 0.0
2015 8215 0.0 0.0 0.0
2016 7700 0.0 0.0 0.0
2017 4844 0.0 0.0 0.0
2018 7617 0.0 0.0 0.0
2019 8104 0.0 0.0 0.0
2020 1607 0.0 0.0 0.0

For data sources see[6]

References