If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0865102401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.481083,"lon":-115.431009,"icon":""}]} |
Location: 00/01-24-086-10W5/0 | |
Location Alias: 00/01-24-86-10 W5M | |
Location Alias 2: 00/01-24-086-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 5 | |
Range: 10 | |
Section: 24 | |
County/Municipality: Loon Lake 235 | |
Well Name: HARVEST HZ LOON 1-24-86-10 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0455335 | |
License Date: 2013-02-20 | |
License Status: Issued | |
Spud Date: 2013-09-03 | |
Final Drill Date: 2013-10-02 | |
Well Total Depth: 3040.00 m | |
Surface Hole Latitude: 56.481083 | |
Surface Hole Longitude: -115.431009 |
Date | Event |
---|---|
2013-02-20 | Obtained License |
2013-09-03 | Surface Casing Operation Performed |
2013-09-23 | Lost Circulation Occurred |
2013-09-25 | Direction Drilling Operation Performed - Deviate |
2013-09-26 | Direction Drilling Operation Performed - Horizontal |
2013-10-02 | Finished Drilling |
2013-10-02 | Well Log Performed |
2013-10-02 | Well Mode changed to Drilled and Cased |
2013-10-03 | Production Casing Operation Performed |
2013-10-04 | Rig Released |
2013-10-14 | Well Log Performed |
2013-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-11-12 | Well Began Production |
2013-11-12 | Well Fluid changed to Crude Oil |
2013-11-12 | Well Mode changed to Pumping |
2013-11-14 | Well Log Performed |
2013-12-04 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-09-03 | Nabors Drilling Limited | 103AC | N/A | Set Surface |
2013-09-23 | Nabors Drilling Limited | 103AC | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-09-25 | 1010.00 | Deviate (5 - 79 degrees) |
2013-09-26 | 1570.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-11-04 | Multi-Stage Fracture | 3010.60 | 3014.80 | 0 |
2013-11-04 | Multi-Stage Fracture | 2333.60 | 2337.80 | 0 |
2013-11-04 | Multi-Stage Fracture | 2258.10 | 2262.30 | 0 |
2013-11-04 | Multi-Stage Fracture | 2182.80 | 2187.00 | 0 |
2013-11-09 | Multi-Stage Fracture | 2107.60 | 2111.70 | 0 |
2013-11-09 | Multi-Stage Fracture | 2032.60 | 2036.80 | 0 |
2013-11-09 | Multi-Stage Fracture | 1957.10 | 1961.20 | 0 |
2013-11-10 | Multi-Stage Fracture | 1881.70 | 1885.90 | 0 |
2013-11-10 | Multi-Stage Fracture | 1806.20 | 1810.40 | 0 |
2013-11-10 | Multi-Stage Fracture | 1730.80 | 1735.00 | 0 |
2013-11-10 | Multi-Stage Fracture | 1652.20 | 1656.40 | 0 |
2013-11-04 | Multi-Stage Fracture | 2935.30 | 2939.50 | 0 |
2013-11-04 | Multi-Stage Fracture | 2860.10 | 2864.30 | 0 |
2013-11-04 | Multi-Stage Fracture | 2785.10 | 2789.30 | 0 |
2013-11-04 | Multi-Stage Fracture | 2709.80 | 2714.00 | 0 |
2013-11-04 | Multi-Stage Fracture | 2634.50 | 2638.70 | 0 |
2013-11-04 | Multi-Stage Fracture | 2559.50 | 2563.60 | 0 |
2013-11-04 | Multi-Stage Fracture | 2484.20 | 2488.40 | 0 |
2013-11-04 | Multi-Stage Fracture | 2408.80 | 2412.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-11-04 | 2013-11-10 | 1,369 | 2,510 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.9245 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 13.834 | N/A | ||
20/40 SiberProp | Calfrac | Quartz | 14808-60-7 | 100 | 3.5462 | N/A | ||
Activator W | Calfrac | Activator | Alcohols. C12-14-Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0765 | N/A | |
Methanol | 67-56-1 | 100 | 0.0767 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0808 | N/A | ||||
DWP-903 | Calfrac | Breaker | 1.2-Ethanediol | 107-21-1 | 100 | 0.1068 | N/A | |
Cellulase | 9012-54-8 | 100 | 0.1319 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1061 | N/A | ||||
DWP-218 | Calfrac | Buffer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1064 | N/A | |
Organic acid | 8456 | 100 | 0.1064 | N/A | ||||
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.1084 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.1117 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.1091 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1306 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.1084 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.1102 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.1117 | N/A | ||||
DWP-201 | Calfrac | Gelling Agent | Guar gum. carboxymethyl 2-hydroxypropyl ether. sodium salt | 68130-15-4 | 100 | 0.588 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.5878 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-10-26 | 2013-10-28 | Oilfield Produced Water | 463 |
2013-10-26 | 2013-10-28 | Oilfield Produced Water | 1522 |
2013-10-26 | 2013-10-28 | Oilfield Produced Water | 559 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 429 | 0.0 | 0.0 | 0.0 |
2014 | 8651 | 0.0 | 0.0 | 0.0 |
2015 | 8408 | 0.0 | 0.0 | 0.0 |
2016 | 8182 | 0.0 | 0.0 | 0.0 |
2017 | 8557 | 0.0 | 0.0 | 0.0 |
2018 | 8294 | 0.0 | 0.0 | 0.0 |
2019 | 7827 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-23 | Lost Circulation | 776.00 | 788.00 |
2013-11-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]