X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865102912000

Well Details

Well ID: 0865102912000
Loading map...
Location: 00/12-29-086-10W5/0
Location Alias: 00/12-29-86-10 W5M
Location Alias 2: 00/12-29-086-10 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 10
Section: 29
County/Municipality: Northern Sunrise County
Well Name: MURPHY RIGEL LUBICON 12-29-86-10
Operator Name: Harvest Operations Corp.
License Number: 0170397
License Date: 1994-09-13
License Status: RecCertified
Spud Date: 1994-09-26
Final Drill Date: 1994-10-08
Well Total Depth: 1570.00 m
Surface Hole Latitude: 56.488435
Surface Hole Longitude: -115.555049

For data sources see[1][2]

Well History

Date Event
1994-09-13 Obtained License
1994-09-28 Surface Casing Operation Performed
1994-09-30 Direction Drilling Operation Performed - Deviate
1994-10-01 Lost Circulation Occurred
1994-10-08 Finished Drilling
1994-10-08 Well Mode changed to Drilled and Cased
1994-10-10 Well Log Performed
1994-10-11 Drill Stem Test Performed
1994-10-11 Well Log Performed
1994-10-13 Production Casing Operation Performed
1994-10-13 Rig Released
1994-10-19 Perforation Treatment Performed - Jet Perforation
1994-10-19 Well Log Performed
1994-10-21 Perforation Treatment Performed - Jet Perforation
1994-10-21 Well Log Performed
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Flowing
1995-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-31 Perforation Treatment Performed - Cement Squeeze
1995-11-02 Perforation Treatment Performed - Jet Perforation
1995-11-02 Well Log Performed
1995-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-01 Well Fluid changed to Crude Oil
1996-02-01 Well Mode changed to Suspended
1999-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-07 Perforation Treatment Performed - Jet Perforation
1999-03-07 Plug Back Performed
1999-03-07 Well Fluid changed to Crude Oil
1999-03-07 Well Mode changed to Abandoned Zone
1999-03-09 Perforation Treatment Performed - Fractured
2002-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-15 Plug Back Performed
2002-09-15 Well Log Performed
2002-09-18 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-30 700.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-19 Perforation 1542.50 1544.50 13
2002-09-15 Packing Device Capped w/Cement 1421.50 1429.50 0
1994-10-21 Perforation 1529.50 1531.00 13
1995-10-30 Acid Treatment 1529.50 1531.00 0
1995-10-31 Cement Squeeze 1529.50 1544.50 0
1995-11-02 Perforation 1523.00 1530.50 13
1995-11-04 Acid Treatment 1523.00 1530.50 0
1999-03-07 Packing Device Capped w/Cement 1509.00 1517.00 0
1999-03-07 Perforation 1431.50 1439.50 14
1999-03-09 Fracture 1431.50 1439.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1099 0.0 0.0 0.0
1995 2178 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-10-01 Lost Circulation 892.00 1026.00

For data sources see[7]

References