X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865111305002

Well Details

Well ID: 0865111305002
Loading map...
Location: 00/05-13-086-11W5/2
Location Alias: 00/05-13-86-11 W5M
Location Alias 2: 00/05-13-086-11 W5/02
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 11
Section: 13
County/Municipality: Northern Sunrise County
Well Name: HARVEST EVI 5-13-86-11
Operator Name: Harvest Operations Corp.
License Number: 0162698
License Date: 1993-12-01
License Status: Suspension
Spud Date: 1993-12-04
Final Drill Date: 1993-12-17
Well Total Depth: 1555.00 m
Surface Hole Latitude: 56.453871
Surface Hole Longitude: -115.603472

For data sources see[1][2]

Well History

Date Event
1993-12-01 Obtained License
1993-12-06 Surface Casing Operation Performed
1993-12-17 Finished Drilling
1993-12-17 Well Log Performed
1993-12-17 Well Mode changed to Drilled and Cased
1993-12-19 Drill Stem Test Performed
1993-12-20 Production Casing Operation Performed
1993-12-20 Rig Released
1994-02-04 Well Log Performed
1994-02-06 Perforation Treatment Performed - Jet Perforation
1995-03-04 Well Log Performed
1995-03-05 Perforation Treatment Performed - Jet Perforation
1995-03-28 Perforation Treatment Performed - Fractured
1995-08-02 Well Log Performed
1998-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-29 Plug Back Performed
1998-10-29 Well Log Performed
1998-10-30 Perforation Treatment Performed - Jet Perforation
1998-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-31 Well Log Performed
1998-11-04 Well Began Injection
1998-11-04 Well Fluid changed to Water
1998-11-04 Well Type changed to Disposal
2014-03-01 Well Fluid changed to Water
2014-03-01 Well Mode changed to Suspended
2014-03-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-06 Perforation 1527.50 1528.50 13
1995-03-05 Perforation 1528.50 1530.50 13
1995-03-28 Fracture 1527.50 1530.50 0
1998-10-29 Packing Device Capped w/Cement 1512.70 1520.70 0
1998-10-30 Perforation 906.00 912.00 13
1998-10-30 Perforation 889.00 896.00 13
1998-10-30 Perforation 874.00 880.00 13
1998-10-31 Acid Treatment 874.00 912.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

References