X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865111606002

Well Details

Well ID: 0865111606002
Loading map...
Location: 00/06-16-086-11W5/2
Location Alias: 00/06-16-86-11 W5M
Location Alias 2: 00/06-16-086-11 W5/02
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 11
Section: 16
County/Municipality: Northern Sunrise County
Well Name: HARVEST EVI 11-16-86-11
Operator Name: Harvest Operations Corp.
License Number: 0393012
License Date: 2008-01-25
License Status: Amended
Spud Date: 2008-01-27
Final Drill Date: 2008-02-17
Well Total Depth: 2342.00 m
Surface Hole Latitude: 56.462507
Surface Hole Longitude: -115.674626

For data sources see[1][2]

Well History

Date Event
2008-01-25 Obtained License
2008-01-28 Surface Casing Operation Performed
2008-02-02 Direction Drilling Operation Performed - Horizontal
2008-02-08 Intermediate Casing Operation Performed
2008-02-11 Direction Drilling Operation Performed - Sidetrack Fish
2008-02-17 Finished Drilling
2008-02-17 Well Log Performed
2008-02-17 Well Mode changed to Drilled and Cased
2008-02-18 Rig Released
2008-03-07 Well Log Performed
2008-03-08 Well Began Production
2008-03-08 Well Fluid changed to Crude Oil
2008-03-08 Well Mode changed to Pumping
2008-08-11 Perforation Treatment Performed - Open-Hole Completion
2008-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-12 Perforation Treatment Performed - Jet Perforation
2010-01-16 Well Log Performed
2010-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-02 1197.00 Horizontal
2008-02-11 1698.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-08-11 Open Hole/Barefoot Completion 2336.60 2342.00 0
2008-08-15 Multi-Stage Fracture 2282.30 2282.40 0
2008-08-15 Multi-Stage Fracture 2179.50 2179.60 0
2008-08-15 Multi-Stage Fracture 1933.70 1933.80 0
2008-08-15 Multi-Stage Fracture 1870.60 1870.70 0
2008-08-15 Multi-Stage Fracture 1780.20 1780.30 0
2010-01-12 Perforation 1584.00 1593.40 20
2010-01-21 Acid Treatment 1584.00 1593.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5522 0.0 0.0 0.0
2009 8076 0.0 0.0 0.0
2010 8372 0.0 0.0 0.0
2011 8669 0.0 0.0 0.0
2012 8039 0.0 0.0 0.0
2013 7539 0.0 0.0 0.0
2014 7977 0.0 0.0 0.0
2015 8724 0.0 0.0 0.0
2016 8593 0.0 0.0 0.0
2017 8597 0.0 0.0 0.0
2018 8293 0.0 0.0 0.0
2019 8497 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References