X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865112103000

Well Details

Well ID: 0865112103000
Loading map...
Location: 00/03-21-086-11W5/0
Location Alias: 00/03-21-86-11 W5M
Location Alias 2: 00/03-21-086-11 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 11
Section: 21
County/Municipality: Northern Sunrise County
Well Name: HARVEST HZ EVI 3-21-86-11
Operator Name: Harvest Operations Corp.
License Number: 0437993
License Date: 2011-10-25
License Status: Issued
Spud Date: 2011-11-26
Final Drill Date: 2011-12-08
Well Total Depth: 3061.00 m
Surface Hole Latitude: 56.482747
Surface Hole Longitude: -115.676210

For data sources see[1][2]

Well History

Date Event
2011-10-25 Obtained License
2011-11-27 Surface Casing Operation Performed
2011-11-28 Well Log Performed
2011-11-29 Direction Drilling Operation Performed - Horizontal
2011-12-08 Finished Drilling
2011-12-08 Well Log Performed
2011-12-08 Well Mode changed to Drilled and Cased
2011-12-12 Production Casing Operation Performed
2011-12-12 Rig Released
2012-01-27 Perforation Treatment Performed - Jet Perforation
2012-01-30 Perforation Treatment Performed - Fractured
2012-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-10 Well Began Production
2012-02-10 Well Fluid changed to Crude Oil
2012-02-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-29 1168.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-27 Perforation 3032.50 3033.00 5
2012-01-31 Multi-Stage Fracture 2673.70 2677.00 0
2012-01-31 Multi-Stage Fracture 2602.10 2606.00 0
2012-01-31 Multi-Stage Fracture 2531.00 2534.90 0
2012-02-01 Multi-Stage Fracture 2460.00 2463.00 0
2012-02-01 Multi-Stage Fracture 2388.90 2392.80 0
2012-02-01 Multi-Stage Fracture 2318.90 2322.80 0
2012-02-01 Multi-Stage Fracture 2252.20 2256.10 0
2012-02-01 Multi-Stage Fracture 2181.40 2185.30 0
2012-02-01 Multi-Stage Fracture 2109.80 2113.70 0
2012-02-01 Multi-Stage Fracture 2026.40 2030.30 0
2012-01-27 Perforation 2962.50 2963.00 5
2012-02-01 Multi-Stage Fracture 1969.20 1973.10 0
2012-02-01 Multi-Stage Fracture 1898.10 1902.00 0
2012-02-01 Multi-Stage Fracture 1826.60 1830.50 0
2012-02-01 Multi-Stage Fracture 1757.10 1761.00 0
2012-02-01 Multi-Stage Fracture 1685.60 1689.50 0
2012-02-01 Multi-Stage Fracture 1627.70 1631.60 0
2012-01-27 Perforation 2891.50 2892.00 5
2012-01-27 Perforation 2821.50 2822.00 5
2012-01-30 Fracture 3032.50 3033.00 0
2012-01-30 Fracture 2962.50 2963.00 0
2012-01-30 Fracture 2891.50 2892.00 0
2012-01-30 Fracture 2821.50 2822.00 0
2012-01-31 Multi-Stage Fracture 2745.10 2748.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6816 0.0 0.0 0.0
2013 7740 0.0 0.0 0.0
2014 8398 0.0 0.0 0.0
2015 8204 0.0 0.0 0.0
2016 8573 0.0 0.0 0.0
2017 8129 0.0 0.0 0.0
2018 3190 0.0 0.0 0.0
2019 6512 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[6]

References