If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0865112103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.482747,"lon":-115.67621,"icon":""}]} |
| Location: 00/03-21-086-11W5/0 | |
| Location Alias: 00/03-21-86-11 W5M | |
| Location Alias 2: 00/03-21-086-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 086 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 21 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: HARVEST HZ EVI 3-21-86-11 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0437993 | |
| License Date: 2011-10-25 | |
| License Status: Issued | |
| Spud Date: 2011-11-26 | |
| Final Drill Date: 2011-12-08 | |
| Well Total Depth: 3061.00 m | |
| Surface Hole Latitude: 56.482747 | |
| Surface Hole Longitude: -115.676210 |
| Date | Event |
|---|---|
| 2011-10-25 | Obtained License |
| 2011-11-27 | Surface Casing Operation Performed |
| 2011-11-28 | Well Log Performed |
| 2011-11-29 | Direction Drilling Operation Performed - Horizontal |
| 2011-12-08 | Finished Drilling |
| 2011-12-08 | Well Log Performed |
| 2011-12-08 | Well Mode changed to Drilled and Cased |
| 2011-12-12 | Production Casing Operation Performed |
| 2011-12-12 | Rig Released |
| 2012-01-27 | Perforation Treatment Performed - Jet Perforation |
| 2012-01-30 | Perforation Treatment Performed - Fractured |
| 2012-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-10 | Well Began Production |
| 2012-02-10 | Well Fluid changed to Crude Oil |
| 2012-02-10 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-11-29 | 1168.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-27 | Perforation | 3032.50 | 3033.00 | 5 |
| 2012-01-31 | Multi-Stage Fracture | 2673.70 | 2677.00 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2602.10 | 2606.00 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2531.00 | 2534.90 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2460.00 | 2463.00 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2388.90 | 2392.80 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2318.90 | 2322.80 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2252.20 | 2256.10 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2181.40 | 2185.30 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2109.80 | 2113.70 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2026.40 | 2030.30 | 0 |
| 2012-01-27 | Perforation | 2962.50 | 2963.00 | 5 |
| 2012-02-01 | Multi-Stage Fracture | 1969.20 | 1973.10 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1898.10 | 1902.00 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1826.60 | 1830.50 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1757.10 | 1761.00 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1685.60 | 1689.50 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1627.70 | 1631.60 | 0 |
| 2012-01-27 | Perforation | 2891.50 | 2892.00 | 5 |
| 2012-01-27 | Perforation | 2821.50 | 2822.00 | 5 |
| 2012-01-30 | Fracture | 3032.50 | 3033.00 | 0 |
| 2012-01-30 | Fracture | 2962.50 | 2963.00 | 0 |
| 2012-01-30 | Fracture | 2891.50 | 2892.00 | 0 |
| 2012-01-30 | Fracture | 2821.50 | 2822.00 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2745.10 | 2748.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6816 | 0.0 | 0.0 | 0.0 |
| 2013 | 7740 | 0.0 | 0.0 | 0.0 |
| 2014 | 8398 | 0.0 | 0.0 | 0.0 |
| 2015 | 8204 | 0.0 | 0.0 | 0.0 |
| 2016 | 8573 | 0.0 | 0.0 | 0.0 |
| 2017 | 8129 | 0.0 | 0.0 | 0.0 |
| 2018 | 3190 | 0.0 | 0.0 | 0.0 |
| 2019 | 6512 | 0.0 | 0.0 | 0.0 |
| 2020 | 1991 | 0.0 | 0.0 | 0.0 |
For data sources see[6]