X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865112916020

Well Details

Well ID: 0865112916020
Loading map...
Location: 02/16-29-086-11W5/0
Location Alias: 02/16-29-86-11 W5M
Location Alias 2: 02/16-29-086-11 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 11
Section: 29
County/Municipality: Northern Sunrise County
Well Name: SPL 16-20 HZ 102 EVI EVI 16-29-86-11
Operator Name: Spur Petroleum Ltd.
License Number: 0492140
License Date: 2018-11-20
License Status: Abandoned
Spud Date: 2019-10-03
Final Drill Date: 2019-10-07
Well Total Depth: 1976.00 m
Surface Hole Latitude: 56.475655
Surface Hole Longitude: -115.693575

For data sources see[1][2]

Well History

Date Event
2018-11-20 Obtained License
2019-10-04 Direction Drilling Operation Performed - Deviate
2019-10-04 Drill To LD
2019-10-04 Surface Casing Operation Performed
2019-10-05 Direction Drilling Operation Performed - Horizontal
2019-10-05 Intermediate Casing Operation Performed
2019-10-05 Well Log Performed
2019-10-07 Finished Drilling
2019-10-07 Well Log Performed
2019-10-07 Well Mode changed to Drilled and Cased
2019-10-15 Perforation Treatment Performed - Open-Hole Completion
2019-10-15 Rig Released
2019-10-15 Well Log Performed
2019-10-21 Well Began Production
2019-10-21 Well Fluid changed to Crude Bitumen
2019-10-21 Well Mode changed to Pumping
2019-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-04 Plug Back Performed
2019-12-04 Well Fluid changed to Crude Bitumen
2019-12-04 Well Mode changed to Abandoned Zone
2019-12-05 Well Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-04 Lasso Drilling Corporation 5 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-10-04 137.20 Deviate (5 - 79 degrees)
2019-10-05 484.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-15 Open Hole/Barefoot Completion 577.00 1976.00 0
2019-12-04 Packing Device Capped w/Cement 140.00 475.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 48 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-15 No Incident Encountered 0.00 0.00
2019-12-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References