If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0865131910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.472197,"lon":-116.040114,"icon":""}]} |
Location: 00/10-19-086-13W5/0 | |
Location Alias: 00/10-19-86-13 W5M | |
Location Alias 2: 00/10-19-086-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 5 | |
Range: 13 | |
Section: 19 | |
County/Municipality: Woodland Cree 228 | |
Well Name: REDEARTH GOLDEN 10-19-86-13 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0226484 | |
License Date: 1999-09-20 | |
License Status: Suspension | |
Spud Date: 1999-10-01 | |
Final Drill Date: 1999-10-09 | |
Well Total Depth: 1607.00 m | |
Surface Hole Latitude: 56.472197 | |
Surface Hole Longitude: -116.040114 |
Date | Event |
---|---|
1999-09-20 | Obtained License |
1999-10-02 | Surface Casing Operation Performed |
1999-10-09 | Finished Drilling |
1999-10-10 | Well Log Performed |
1999-10-11 | Production Casing Operation Performed |
1999-10-12 | Rig Released |
1999-10-12 | Well Mode changed to Drilled and Cased |
1999-10-22 | Perforation Treatment Performed - Jet Perforation |
1999-10-22 | Well Log Performed |
1999-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-24 | Well Began Production |
1999-11-24 | Well Fluid changed to Crude Oil |
1999-11-24 | Well Mode changed to Pumping |
2001-09-30 | Well Fluid changed to Crude Oil |
2001-09-30 | Well Mode changed to Suspended |
2003-10-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-10-04 | Plug Back Performed |
2003-10-04 | Well Fluid changed to Crude Oil |
2003-10-04 | Well Log Performed |
2003-10-04 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-10-22 | Perforation | 1552.60 | 1554.60 | 14 |
1999-10-23 | Acid Treatment | 1552.60 | 1554.60 | 0 |
2003-10-04 | Packing Device Capped w/Cement | 1539.00 | 1547.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 900 | 0.0 | 0.0 | 0.0 |
2000 | 8044 | 0.0 | 0.0 | 0.0 |
2001 | 2998 | 0.0 | 0.0 | 0.0 |
For data sources see[5]