X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865132805000

Well Details

Well ID: 0865132805000
Loading map...
Location: 00/05-28-086-13W5/0
Location Alias: 00/05-28-86-13 W5M
Location Alias 2: 00/05-28-086-13 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 13
Section: 28
County/Municipality: Northern Sunrise County
Well Name: STORM 5C EVI 5-28-86-13
Operator Name: Harvest Operations Corp.
License Number: 0221749
License Date: 1999-02-24
License Status: RecCertified
Spud Date: 1999-02-27
Final Drill Date: 1999-03-13
Well Total Depth: 1675.00 m
Surface Hole Latitude: 56.485521
Surface Hole Longitude: -115.999050

For data sources see[1][2]

Well History

Date Event
1999-02-24 Obtained License
1999-02-28 Lost Circulation Occurred
1999-03-01 Surface Casing Operation Performed
1999-03-04 Direction Drilling Operation Performed - Deviate
1999-03-13 Finished Drilling
1999-03-14 Well Log Performed
1999-03-15 Production Casing Operation Performed
1999-03-15 Well Log Performed
1999-03-16 Rig Released
1999-03-16 Well Mode changed to Drilled and Cased
1999-03-17 Perforation Treatment Performed - Jet Perforation
1999-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-20 Perforation Treatment Performed - Cement Squeeze
1999-03-21 Perforation Treatment Performed - Jet Perforation
1999-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-21 Plug Back Performed
1999-10-21 Well Mode changed to Abandoned Zone
1999-10-22 Well Abandoned
1999-10-22 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-03-04 1019.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-17 Perforation 1601.00 1604.00 14
1999-03-19 Acid Treatment 1601.00 1604.00 0
1999-03-20 Cement Squeeze 1601.00 1604.00 0
1999-03-21 Perforation 1601.00 1604.00 14
1999-03-22 Acid Treatment 1601.00 1604.00 0
1999-03-23 Acid Treatment 1601.00 1604.00 0
1999-03-25 Acid Treatment 1601.00 1604.00 0
1999-10-21 Packing Device Capped w/Cement 1587.00 1595.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1999-02-28 Lost Circulation 227.00 227.00

For data sources see[6]

References