X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865190210000

Well Details

Well ID: 0865190210000
Loading map...
Location: 00/10-02-086-19W5/0
Location Alias: 00/10-02-86-19 W5M
Location Alias 2: 00/10-02-086-19 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 19
Section: 02
County/Municipality: Northern Sunrise County
Well Name: CNUL CADOTTE 10-2-86-19
Operator Name: Canadian Natural Upgrading Limited
License Number: 0044763
License Date: 1973-01-08
License Status: Abandoned
Spud Date: 1973-01-09
Final Drill Date: 1973-01-21
Well Total Depth: 551.70 m
Surface Hole Latitude: 56.430507
Surface Hole Longitude: -116.883949

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-01-08 Obtained License
1973-01-21 Finished Drilling
1973-01-22 Drill Stem Test Performed
1973-01-23 Drill Stem Test Performed
1973-01-23 Production Casing Operation Performed
1973-02-21 Perforation Treatment Performed - Jet Perforation
1973-02-21 Well Log Performed
1973-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-02-28 Well Mode changed to Drilled and Cased
1973-12-11 Well Began Production
1973-12-11 Well Fluid changed to Gas
1973-12-11 Well Mode changed to Flowing
1974-02-17 Well Fluid changed to Gas
1974-02-17 Well Mode changed to Suspended
1979-10-03 Well Fluid changed to Gas
1979-10-03 Well Mode changed to Flowing
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended
2009-12-02 Well Log Performed
2009-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-05 Plug Back Performed
2009-12-05 Well Fluid changed to Gas
2009-12-05 Well Mode changed to Abandoned Zone
2010-01-14 Well Abandoned
2010-01-14 Well Fluid changed to Gas
2010-01-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-21 Perforation 520.60 524.30 7
1973-02-22 Acid Treatment 520.60 524.30 0
2009-12-05 Packing Device Capped w/Cement 505.80 514.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 499 0.0 0.0 0.0
1974 868 0.0 0.0 0.0
1979 1484 0.0 0.0 0.0
1980 7929 0.0 0.0 0.0
1981 7981 0.0 0.0 0.0
1982 7312 0.0 0.0 0.0
1983 8531 0.0 0.0 0.0
1984 8507 0.0 0.0 0.0
1985 7138 0.0 0.0 0.0
1986 7116 0.0 0.0 0.0
1987 6361 0.0 0.0 0.0
1988 7976 0.0 0.0 0.0
1989 8493 0.0 0.0 0.0
1990 8042 0.0 0.0 0.0
1991 8240 0.0 0.0 0.0
1992 8298 0.0 0.0 0.0
1993 8352 0.0 0.0 0.0
1994 8427 0.0 0.0 0.0
1995 8646 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8255 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 7320 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8495 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 7559 0.0 0.0 0.0
2007 6502 0.0 0.0 0.0

For data sources see[5]

References