If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0865241816002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/16-18-086-24W5/2 | |
Location Alias: 00/16-18-86-24 W5M | |
Location Alias 2: 00/16-18-086-24 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 5 | |
Range: 24 | |
Section: 18 | |
County/Municipality: County of Northern Lights | |
Well Name: SUNCOR CHINOOK VALLEY 16-18-86-24 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0207939 | |
License Date: 1997-11-05 | |
License Status: RecCertified | |
Spud Date: 1997-11-17 | |
Final Drill Date: 1997-11-21 | |
Well Total Depth: 865.00 m | |
Surface Hole Latitude: 56.465133 | |
Surface Hole Longitude: -117.773162 |
Date | Event |
---|---|
1997-11-05 | Obtained License |
1997-11-17 | Well Log Performed |
1997-11-18 | Surface Casing Operation Performed |
1997-11-21 | Finished Drilling |
1997-11-21 | Well Log Performed |
1997-11-21 | Well Mode changed to Drilled and Cased |
1997-11-23 | Production Casing Operation Performed |
1997-11-23 | Rig Released |
1997-12-21 | Well Log Performed |
1998-01-11 | Perforation Treatment Performed - Jet Perforation |
1998-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-01-19 | Well Log Performed |
1998-01-20 | Perforation Treatment Performed - Jet Perforation |
1998-01-20 | Well Log Performed |
1998-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-01-24 | Plug Back Performed |
1998-01-24 | Well Log Performed |
2000-10-21 | Perforation Treatment Performed - Jet Perforation |
2000-10-21 | Well Log Performed |
2000-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-10-22 | Perforation Treatment Performed - Jet Perforation |
2000-10-22 | Plug Back Performed |
2000-10-22 | Well Log Performed |
2000-10-22 | Well Mode changed to Abandoned Zone |
2001-11-22 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2001-11-22 | Perforation Treatment Performed - Jet Perforation |
2001-11-22 | Well Log Performed |
2007-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-23 | Perforation Treatment Performed - Jet Perforation |
2007-03-23 | Plug Back Performed |
2007-03-25 | Perforation Treatment Performed - Cement Plug |
2007-03-25 | Perforation Treatment Performed - Cement Squeeze |
2007-03-25 | Plug Back Performed |
2007-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-26 | Plug Back Performed |
2007-03-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-01-11 | Perforation | 805.00 | 811.00 | 13 |
2000-10-22 | Perforation | 719.20 | 719.60 | 2 |
2000-10-22 | Perforation | 719.00 | 720.30 | 13 |
2000-10-22 | Perforation | 713.00 | 716.00 | 13 |
2000-10-22 | Packing Device Capped w/Cement | 700.00 | 708.00 | 0 |
2000-10-22 | Perforation | 567.50 | 570.00 | 13 |
2000-10-22 | Perforation | 534.00 | 539.50 | 13 |
2001-11-22 | Bridge Plug, No Cement | 565.00 | 566.00 | 0 |
2001-11-22 | Bridge Plug, No Cement | 533.20 | 534.20 | 0 |
2001-11-22 | Perforation | 528.50 | 532.50 | 17 |
2007-03-23 | Packing Device Capped w/Cement | 510.50 | 518.50 | 0 |
1998-01-11 | Perforation | 819.00 | 821.00 | 13 |
2007-03-23 | Perforation | 189.00 | 193.00 | 17 |
2007-03-25 | Cement Squeeze | 189.00 | 193.00 | 0 |
2007-03-25 | Cement Plug | 94.00 | 189.00 | 0 |
2007-03-26 | Packing Device Capped w/Cement | 77.00 | 85.00 | 0 |
1998-01-11 | Perforation | 805.00 | 811.00 | 13 |
1998-01-17 | Acid Treatment | 805.00 | 821.00 | 0 |
1998-01-20 | Perforation | 795.00 | 798.00 | 13 |
1998-01-21 | Acid Treatment | 795.00 | 798.00 | 0 |
1998-01-24 | Packing Device Capped w/Cement | 795.00 | 803.00 | 0 |
1998-01-24 | Packing Device Capped w/Cement | 780.00 | 788.00 | 0 |
2000-10-21 | Perforation | 722.00 | 723.50 | 13 |
For data sources see[4]