X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0866033210003

Well Details

Well ID: 0866033210003
Loading map...
Location: 00/10-32-086-03W6/3
Location Alias: 00/10-32-86-03 W6M
Location Alias 2: 00/10-32-086-03 W6/03
Country: Canada
Province: Alberta
Township: 086
Meridian: 6
Range: 03
Section: 32
County/Municipality: Clear Hills County
Well Name: DEVON HINES 10-32-86-3
Operator Name: Shoreline Energy Corp.
License Number: 0099856
License Date: 1982-12-20
License Status: Abandoned
Spud Date: 1982-12-31
Final Drill Date: 1983-01-05
Well Total Depth: 1098.00 m
Surface Hole Latitude: 56.504739
Surface Hole Longitude: -118.430676

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-20 Obtained License
1983-01-05 Finished Drilling
1983-01-05 Well Mode changed to Drilled and Cased
1983-01-06 Drill Stem Test Performed
1983-01-07 Drill Stem Test Performed
1983-01-08 Drill Stem Test Performed
1983-01-09 Drill Stem Test Performed
1983-01-10 Drill Stem Test Performed
1983-01-11 Production Casing Operation Performed
1984-10-22 Perforation Treatment Performed - Jet Perforation
1984-10-24 Perforation Treatment Performed - Jet Perforation
1992-05-13 Perforation Treatment Performed - Jet Perforation
1992-05-13 Well Log Performed
1992-10-06 Well Log Performed
1992-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-08 Perforation Treatment Performed - Cement Squeeze
1992-10-09 Well Log Performed
1992-10-10 Well Log Performed
1992-10-11 Perforation Treatment Performed - Jet Perforation
1992-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-13 Perforation Treatment Performed - Cement Squeeze
1992-10-16 Well Log Performed
1992-10-17 Perforation Treatment Performed - Jet Perforation
1992-10-20 Well Began Production
1992-10-20 Well Fluid changed to Gas
1992-10-20 Well Mode changed to Flowing
1994-03-18 Well Log Performed
1994-03-19 Perforation Treatment Performed - Jet Perforation
1994-03-27 Well Log Performed
1994-03-30 Perforation Treatment Performed - Jet Perforation
1999-01-30 Well Log Performed
1999-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-01 Plug Back Performed
1999-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-02-02 Perforation Treatment Performed - Cement Squeeze
1999-02-02 Plug Back Performed
1999-02-02 Well Fluid changed to Gas
1999-02-02 Well Mode changed to Flowing
1999-02-04 Well Log Performed
1999-02-05 Perforation Treatment Performed - Jet Perforation
1999-02-05 Well Log Performed
1999-02-06 Perforation Treatment Performed - Jet Perforation
1999-03-02 Well Fluid changed to Gas
1999-03-02 Well Mode changed to Flowing
1999-03-03 Well Fluid changed to Gas
1999-03-03 Well Mode changed to Flowing
2008-02-01 Well Fluid changed to Gas
2008-02-01 Well Mode changed to Suspended
2018-11-03 Well Log Performed
2018-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-04 Plug Back Performed
2018-11-04 Well Fluid changed to Gas
2018-11-04 Well Log Performed
2018-11-04 Well Mode changed to Abandoned Zone
2019-01-25 Well Log Performed
2019-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-29 Perforation Treatment Performed - Cement Squeeze
2019-01-29 Perforation Treatment Performed - Jet Perforation
2019-01-29 Plug Back Performed
2019-01-29 Well Log Performed
2019-02-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-10-22 Perforation 966.00 967.00 13
1992-10-17 Perforation 759.50 761.50 13
1994-03-19 Perforation 759.50 761.50 14
1994-03-19 Perforation 763.00 765.00 14
1994-03-30 Perforation 966.00 967.00 14
1994-03-30 Perforation 968.50 972.00 14
1999-02-01 Packing Device Capped w/Cement 952.00 960.00 0
1999-02-02 Packing Device Capped w/Cement 927.00 935.00 0
1999-02-02 Cement Squeeze 759.50 765.00 0
1999-02-05 Perforation 786.50 787.50 13
1999-02-06 Perforation 673.00 673.50 13
1984-10-22 Perforation 968.50 971.50 13
2018-11-04 Packing Device Capped w/Cement 747.00 755.00 0
2018-11-04 Packing Device Capped w/Cement 655.00 663.00 0
2019-01-29 Perforation 298.00 299.00 13
2019-01-29 Cement Squeeze 298.00 299.00 0
2019-01-29 Packing Device Capped w/Cement 283.00 293.00 0
1984-10-24 Perforation 942.50 946.50 13
1992-05-13 Perforation 969.00 972.00 13
1992-10-08 Acid Treatment 942.50 946.50 0
1992-10-08 Cement Squeeze 942.50 946.50 0
1992-10-11 Perforation 942.00 943.50 13
1992-10-13 Acid Treatment 942.00 943.50 0
1992-10-13 Cement Squeeze 942.00 943.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1664 0.0 0.0 0.0
1993 8252 0.0 0.0 0.0
1994 7529 0.0 0.0 0.0
1995 8667 0.0 0.0 0.0
1996 8656 0.0 0.0 0.0
1997 8279 0.0 0.0 0.0
1998 1215 0.0 0.0 0.0
1999 6299 0.0 0.0 0.0
2000 7682 0.0 0.0 0.0
2001 301 0.0 0.0 0.0
2007 738 0.0 0.0 0.0
2008 742 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References