X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0866033410002

Well Details

Well ID: 0866033410002
Loading map...
Location: 00/10-34-086-03W6/2
Location Alias: 00/10-34-86-03 W6M
Location Alias 2: 00/10-34-086-03 W6/02
Country: Canada
Province: Alberta
Township: 086
Meridian: 6
Range: 03
Section: 34
County/Municipality: Clear Hills County
Well Name: DEVON HINES 10-34-86-3
Operator Name: Shoreline Energy Corp.
License Number: 0079254
License Date: 1979-11-16
License Status: Abandoned
Spud Date: 1979-11-22
Final Drill Date: 1979-11-29
Well Total Depth: 1068.00 m
Surface Hole Latitude: 56.502403
Surface Hole Longitude: -118.381021

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-16 Obtained License
1979-11-29 Finished Drilling
1979-11-29 Well Mode changed to Drilled and Cased
1979-12-01 Drill Stem Test Performed
1979-12-02 Drill Stem Test Performed
1979-12-03 Production Casing Operation Performed
1980-01-13 Perforation Treatment Performed - Jet Perforation
1980-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-01-17 Perforation Treatment Performed - Jet Perforation
1999-01-11 Perforation Treatment Performed - Jet Perforation
1999-01-11 Well Log Performed
1999-01-11 Well Mode changed to Drilled and Cased
1999-03-23 Well Began Production
1999-03-23 Well Fluid changed to Gas
1999-03-23 Well Mode changed to Flowing
2003-11-27 Well Structure changed to Commingled
2018-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-11-23 Plug Back Performed
2018-11-23 Well Log Performed
2018-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-24 Perforation Treatment Performed - Jet Perforation
2018-11-24 Plug Back Performed
2018-11-24 Well Log Performed
2018-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-25 Perforation Treatment Performed - Cement Squeeze
2018-11-25 Plug Back Performed
2018-12-09 Well Abandoned
2019-11-24 Well Mode changed to Abandoned Zone
2019-11-24 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-13 Perforation 1038.50 1040.50 13
2018-11-25 Packing Device Capped w/Cement 300.00 310.00 0
1980-01-16 Packing Device Capped w/Cement 1021.00 1029.00 0
1980-01-17 Perforation 630.00 634.50 7
1999-01-11 Perforation 751.50 753.50 17
2018-11-23 Packing Device Capped w/Cement 737.20 745.20 0
2018-11-23 Bridge Plug, No Cement 623.00 623.50 0
2018-11-24 Packing Device Capped w/Cement 612.00 620.00 0
2018-11-24 Perforation 315.00 316.00 13
2018-11-25 Cement Squeeze 315.00 316.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4142 0.0 0.0 0.0
2000 4678 0.0 0.0 0.0
2001 3887 0.0 0.0 0.0
2002 5451 0.0 0.0 0.0
2003 7561 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References