If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0866033503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.508087,"lon":-118.361248,"icon":""}]} |
Location: 00/03-35-086-03W6/0 | |
Location Alias: 00/03-35-86-03 W6M | |
Location Alias 2: 00/03-35-086-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 6 | |
Range: 03 | |
Section: 35 | |
County/Municipality: Clear Hills County | |
Well Name: LAKERIDGE HZ HINES 3-35-86-3 | |
Operator Name: Shoreline Energy Corp. | |
License Number: 0439005 | |
License Date: 2011-11-16 | |
License Status: Abandoned | |
Spud Date: 2011-11-24 | |
Final Drill Date: 2011-12-06 | |
Well Total Depth: 2233.00 m | |
Surface Hole Latitude: 56.508087 | |
Surface Hole Longitude: -118.361248 |
Date | Event |
---|---|
2011-11-16 | Obtained License |
2011-11-25 | Surface Casing Operation Performed |
2011-11-27 | Direction Drilling Operation Performed - Horizontal |
2011-12-02 | Well Log Performed |
2011-12-03 | Intermediate Casing Operation Performed |
2011-12-06 | Finished Drilling |
2011-12-06 | Well Mode changed to Drilled and Cased |
2011-12-08 | Liner Casing Operation Performed |
2011-12-08 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-08 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-12-09 | Rig Released |
2012-03-27 | Well Began Production |
2012-03-27 | Well Fluid changed to Gas |
2012-03-27 | Well Mode changed to Flowing |
2015-06-09 | Perforation Treatment Performed - Jet Perforation |
2018-11-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-16 | Plug Back Performed |
2018-11-16 | Well Fluid changed to Gas |
2018-11-16 | Well Mode changed to Abandoned Zone |
2018-11-23 | Well Abandoned |
2018-11-23 | Well Fluid changed to Gas |
2018-11-23 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-27 | 770.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-08 | Slotted Liner | 1166.20 | 1893.00 | 0 |
2011-12-08 | Open Hole/Barefoot Completion | 1893.00 | 2233.00 | 0 |
2015-06-09 | Perforation | 987.00 | 988.00 | 17 |
2018-11-16 | Packing Device Capped w/Cement | 999.00 | 1009.00 | 0 |
2018-11-16 | Packing Device Capped w/Cement | 976.00 | 984.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6607 | 0.0 | 0.0 | 0.0 |
2013 | 8705 | 0.0 | 0.0 | 0.0 |
2014 | 8185 | 0.0 | 0.0 | 0.0 |
2015 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-08 | No Incident Encountered | 0.00 | 0.00 |
2018-11-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]