X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0866033506003

Well Details

Well ID: 0866033506003
Loading map...
Location: 00/06-35-086-03W6/3
Location Alias: 00/06-35-86-03 W6M
Location Alias 2: 00/06-35-086-03 W6/03
Country: Canada
Province: Alberta
Township: 086
Meridian: 6
Range: 03
Section: 35
County/Municipality: Clear Hills County
Well Name: DEVON HINES 6-35-86-3
Operator Name: Shoreline Energy Corp.
License Number: 0073614
License Date: 1978-12-22
License Status: Abandoned
Spud Date: 1979-01-03
Final Drill Date: 1979-01-09
Well Total Depth: 1165.00 m
Surface Hole Latitude: 56.499311
Surface Hole Longitude: -118.362604

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-22 Obtained License
1979-01-09 Finished Drilling
1979-01-09 Well Mode changed to Drilled and Cased
1979-01-12 Drill Stem Test Performed
1979-01-13 Production Casing Operation Performed
1979-03-05 Perforation Treatment Performed - Jet Perforation
1979-03-09 Perforation Treatment Performed - Cement Squeeze
1979-03-10 Perforation Treatment Performed - Jet Perforation
1986-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-10 Plug Back Performed
1986-03-11 Perforation Treatment Performed - Jet Perforation
1999-01-16 Well Log Performed
1999-01-17 Perforation Treatment Performed - Jet Perforation
1999-01-17 Well Log Performed
1999-01-18 Well Log Performed
1999-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-19 Perforation Treatment Performed - Jet Perforation
1999-01-19 Plug Back Performed
1999-03-04 Well Began Production
1999-03-04 Well Fluid changed to Gas
1999-03-04 Well Mode changed to Flowing
1999-03-05 Well Fluid changed to Gas
1999-03-05 Well Mode changed to Flowing
2008-06-01 Well Fluid changed to Gas
2008-06-01 Well Mode changed to Suspended
2018-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-18 Plug Back Performed
2018-11-18 Well Log Performed
2018-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-11-19 Plug Back Performed
2018-11-19 Well Fluid changed to Gas
2018-11-19 Well Mode changed to Abandoned Zone
2018-11-23 Well Abandoned
2018-11-23 Well Fluid changed to Gas
2018-11-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-05 Perforation 1022.00 1023.50 13
1999-01-19 Perforation 644.00 645.50 17
1999-01-19 Perforation 647.00 648.50 17
2018-11-18 Packing Device Capped w/Cement 714.00 722.00 0
2018-11-19 Packing Device Capped w/Cement 627.00 635.00 0
1979-03-05 Perforation 1027.00 1031.00 13
1979-03-09 Cement Squeeze 1022.00 1031.00 0
1979-03-10 Perforation 1014.00 1019.00 13
1986-03-10 Packing Device Capped w/Cement 992.00 1000.00 0
1986-03-11 Perforation 733.00 736.00 13
1986-03-11 Perforation 738.00 741.00 13
1999-01-17 Perforation 777.50 779.00 17
1999-01-19 Packing Device Capped w/Cement 760.00 768.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 3983 0.0 0.0 0.0
2000 5469 0.0 0.0 0.0
2001 8402 0.0 0.0 0.0
2002 8606 0.0 0.0 0.0
2003 8743 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8750 0.0 0.0 0.0
2007 1298 0.0 0.0 0.0
2008 814 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References