If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875090406020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.49881,"lon":-115.378017,"icon":""}]} |
Location: 02/06-04-087-09W5/0 | |
Location Alias: 02/06-04-87-09 W5M | |
Location Alias 2: 02/06-04-087-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 09 | |
Section: 04 | |
County/Municipality: Loon Lake 235 | |
Well Name: HARVEST 102 HZ LOON 6-4-87-9 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0455340 | |
License Date: 2013-02-20 | |
License Status: Issued | |
Spud Date: 2013-07-17 | |
Final Drill Date: 2013-08-11 | |
Well Total Depth: 3068.00 m | |
Surface Hole Latitude: 56.498810 | |
Surface Hole Longitude: -115.378017 |
Date | Event |
---|---|
2013-02-20 | Obtained License |
2013-07-18 | Surface Casing Operation Performed |
2013-08-06 | Direction Drilling Operation Performed - Deviate |
2013-08-07 | Direction Drilling Operation Performed - Horizontal |
2013-08-10 | Well Log Performed |
2013-08-11 | Finished Drilling |
2013-08-11 | Well Log Performed |
2013-08-11 | Well Mode changed to Drilled and Cased |
2013-08-13 | Production Casing Operation Performed |
2013-08-13 | Rig Released |
2013-08-20 | Well Log Performed |
2013-09-03 | Well Log Performed |
2013-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-20 | Well Began Production |
2013-09-20 | Well Fluid changed to Crude Oil |
2013-09-20 | Well Mode changed to Pumping |
2013-11-14 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-05 | Nabors Drilling Limited | 103 | N/A | Drill To LD |
2013-07-17 | Nabors Drilling Limited | 103 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-06 | 997.00 | Deviate (5 - 79 degrees) |
2013-08-07 | 1492.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-09-14 | Multi-Stage Fracture | 3023.90 | 3024.90 | 0 |
2013-09-15 | Multi-Stage Fracture | 2372.80 | 2374.70 | 0 |
2013-09-15 | Multi-Stage Fracture | 2302.00 | 2303.90 | 0 |
2013-09-15 | Multi-Stage Fracture | 2231.40 | 2233.20 | 0 |
2013-09-15 | Multi-Stage Fracture | 2160.70 | 2162.50 | 0 |
2013-09-16 | Multi-Stage Fracture | 2090.00 | 2091.90 | 0 |
2013-09-16 | Multi-Stage Fracture | 2019.50 | 2021.30 | 0 |
2013-09-16 | Multi-Stage Fracture | 1948.80 | 1950.60 | 0 |
2013-09-16 | Multi-Stage Fracture | 1878.10 | 1880.00 | 0 |
2013-09-16 | Multi-Stage Fracture | 1807.50 | 1809.40 | 0 |
2013-09-16 | Multi-Stage Fracture | 1736.80 | 1738.70 | 0 |
2013-09-14 | Multi-Stage Fracture | 2938.20 | 2940.50 | 0 |
2013-09-16 | Multi-Stage Fracture | 1666.20 | 1668.00 | 0 |
2013-09-16 | Multi-Stage Fracture | 1595.50 | 1597.60 | 0 |
2013-09-14 | Multi-Stage Fracture | 2867.60 | 2869.50 | 0 |
2013-09-14 | Multi-Stage Fracture | 2796.90 | 2798.80 | 0 |
2013-09-14 | Multi-Stage Fracture | 2726.30 | 2728.10 | 0 |
2013-09-15 | Multi-Stage Fracture | 2655.50 | 2657.40 | 0 |
2013-09-15 | Multi-Stage Fracture | 2584.70 | 2586.60 | 0 |
2013-09-15 | Multi-Stage Fracture | 2514.00 | 2515.90 | 0 |
2013-09-15 | Multi-Stage Fracture | 2443.50 | 2445.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-14 | 2013-09-16 | 1,347 | 3,603 | N/A |
2 | 2013-09-15 | 2013-09-16 | 1,347 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 83.3725 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.0813 | N/A | ||
20/40 SiberProp | Calfrac | Quartz | 14808-60-7 | 100 | 2.1978 | N/A | ||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 1.1977 | N/A | |
Water | 7732-18-5 | 100 | 1.1977 | N/A | ||||
Activator W | Calfrac | Activator | Alcohols. C12-14-Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0789 | N/A | |
Methanol | 67-56-1 | 100 | 0.0791 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0826 | N/A | ||||
DWP-903 | Calfrac | Breaker | 1.2-Ethanediol | 107-21-1 | 100 | 0.1334 | N/A | |
Cellulase | 9012-54-8 | 100 | 0.1484 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1325 | N/A | ||||
DWP-218 | Calfrac | Buffer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1131 | N/A | |
Organic acid | 8456 | 100 | 0.1131 | N/A | ||||
DWP-202 | Calfrac | Crosslinker | 1-Propanol | 71-23-8 | 100 | 0.1082 | N/A | |
Methanol | 67-56-1 | 100 | 0.1031 | N/A | ||||
Zirconium complex | 8294 | 100 | 0.1031 | N/A | ||||
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0958 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0974 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.0959 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1094 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0958 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0967 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0974 | N/A | ||||
DWP-201 | Calfrac | Gelling Agent | Guar gum. carboxymethyl 2-hydroxypropyl ether. sodium salt | 68130-15-4 | 100 | 0.5787 | N/A | |
Non-Hazardous Ingredients | Trade Secret | 100 | 0.5787 | N/A | ||||
2 | Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.1575 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-07 | 2013-09-15 | Oilfield Produced Water | 1405 |
2013-09-07 | 2013-09-14 | Oilfield Produced Water | 630 |
2013-09-07 | 2013-09-15 | Oilfield Produced Water | 1910 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1641 | 0.0 | 0.0 | 0.0 |
2014 | 7979 | 0.0 | 0.0 | 0.0 |
2015 | 8651 | 0.0 | 0.0 | 0.0 |
2016 | 8534 | 0.0 | 0.0 | 0.0 |
2017 | 8432 | 0.0 | 0.0 | 0.0 |
2018 | 7834 | 0.0 | 0.0 | 0.0 |
2019 | 8372 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-13 | No Incident Encountered | 0.00 | 0.00 |
2013-09-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]