If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0875090407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.496324,"lon":-115.361184,"icon":""}]} |
| Location: 00/07-04-087-09W5/0 | |
| Location Alias: 00/07-04-87-09 W5M | |
| Location Alias 2: 00/07-04-087-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 04 | |
| County/Municipality: Loon Lake 235 | |
| Well Name: HARVEST HZ LOON 7-4-87-9 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0462415 | |
| License Date: 2013-12-13 | |
| License Status: Issued | |
| Spud Date: 2014-11-15 | |
| Final Drill Date: 2015-01-19 | |
| Well Total Depth: 3372.00 m | |
| Surface Hole Latitude: 56.496324 | |
| Surface Hole Longitude: -115.361184 |
| Date | Event |
|---|---|
| 2013-12-13 | Obtained License |
| 2014-11-16 | Surface Casing Operation Performed |
| 2015-01-08 | Intermediate Casing Operation Performed |
| 2015-01-11 | Direction Drilling Operation Performed - Deviate |
| 2015-01-12 | Direction Drilling Operation Performed - Horizontal |
| 2015-01-19 | Finished Drilling |
| 2015-01-19 | Well Log Performed |
| 2015-01-19 | Well Mode changed to Drilled and Cased |
| 2015-01-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-01-20 | Production Casing Operation Performed |
| 2015-01-21 | Rig Released |
| 2015-03-22 | Well Log Performed |
| 2015-04-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-04-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-06-01 | Well Began Production |
| 2015-06-01 | Well Fluid changed to Crude Oil |
| 2015-06-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-01-06 | Precision Drilling Corporation | 147 | N/A | Drill To LD |
| 2014-11-15 | Precision Drilling Corporation | 147 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-11 | 1060.60 | Deviate (5 - 79 degrees) |
| 2015-01-12 | 1438.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-01-20 | Open Hole/Barefoot Completion | 3370.00 | 3372.00 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2806.20 | 2806.30 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2746.70 | 2746.80 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2687.20 | 2687.30 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2627.20 | 2627.30 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2553.90 | 2554.00 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2493.90 | 2494.00 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2433.90 | 2434.00 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2362.50 | 2362.60 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2302.60 | 2302.70 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2228.80 | 2228.90 | 0 |
| 2015-04-13 | Multi-Stage Fracture | 3351.60 | 3351.70 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2169.00 | 2169.10 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2095.70 | 2095.80 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2035.80 | 2035.90 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 1976.00 | 1976.10 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 1902.20 | 1902.30 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 1843.90 | 1844.00 | 0 |
| 2015-04-13 | Multi-Stage Fracture | 3275.80 | 3275.90 | 0 |
| 2015-04-13 | Multi-Stage Fracture | 3202.80 | 3202.90 | 0 |
| 2015-04-13 | Multi-Stage Fracture | 3143.10 | 3143.20 | 0 |
| 2015-04-13 | Multi-Stage Fracture | 3083.90 | 3084.00 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 3010.30 | 3010.40 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2936.10 | 2936.20 | 0 |
| 2015-04-14 | Multi-Stage Fracture | 2877.30 | 2877.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-04-13 | 2015-04-14 | 1,328 | 3,762 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 83.9869 | N/A | |||
| 20/40 CRC-LT | Calfrac | Hexamethylenetetramine | 100-97-0 | 100 | 2.5813 | N/A | ||
| Phenolic Resin | 37337-65-8 | 100 | 2.5812 | N/A | ||||
| Phenolic Resin | 9003-35-4 | 100 | 2.5812 | N/A | ||||
| Quartz | 14808-60-7 | 100 | 2.5812 | N/A | ||||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 11.886 | N/A | ||
| 15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.5847 | N/A | |
| Water | 7732-18-5 | 100 | 0.5847 | N/A | ||||
| Activator A | Calfrac | Activator | Alcohols. C-9 to C-11 | 66455-17-2 | 100 | 0.043 | N/A | |
| Alcohols. C-9 to C-11. ethoxylated | 68439-46-3 | 100 | 0.0405 | N/A | ||||
| Isopropyl Alcohol | 67-63-0 | 100 | 0.0405 | N/A | ||||
| DWP-903 | Calfrac | Breaker | 1.2-Ethanediol | 107-21-1 | 100 | 0.1628 | N/A | |
| Cellulase | 9012-54-8 | 100 | 0.1781 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.1622 | N/A | ||||
| DWP-218 | Calfrac | Buffer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1962 | N/A | |
| Organic acid | 8456 | 100 | 0.1962 | N/A | ||||
| DWP-937 | Calfrac | Demulsifier | Citrus terpenes | 94266-47-4 | 100 | 0.0972 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0983 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0972 | N/A | ||||
| Triethylene glycol | 112-27-6 | 100 | 0.0983 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0977 | N/A | ||||
| DWP-201 | Calfrac | Gelling Agent | Guar gum. carboxymethyl 2-hydroxypropyl ether. sodium salt | 68130-15-4 | 100 | 0.6137 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.6137 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-03-24 | 2015-04-21 | Oilfield Produced Water | 975 |
| 2015-03-24 | 2015-04-24 | Oilfield Produced Water | 1026 |
| 2015-03-25 | 2015-04-21 | Oilfield Produced Water | 702 |
| 2015-03-24 | 2015-04-21 | Oilfield Produced Water | 579 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 4966 | 0.0 | 0.0 | 0.0 |
| 2016 | 8495 | 0.0 | 0.0 | 0.0 |
| 2017 | 8551 | 0.0 | 0.0 | 0.0 |
| 2018 | 8342 | 0.0 | 0.0 | 0.0 |
| 2019 | 8282 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-01-21 | No Incident Encountered | 0.00 | 0.00 |
| 2015-04-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]