X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875090610000

Well Details

Well ID: 0875090610000
Loading map...
Location: 00/10-06-087-09W5/0
Location Alias: 00/10-06-87-09 W5M
Location Alias 2: 00/10-06-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 06
County/Municipality: Loon Lake 235
Well Name: STAR ET AL LOON 10-6-87-9
Operator Name: Harvest Operations Corp.
License Number: 0239795
License Date: 2000-07-17
License Status: Suspension
Spud Date: 2000-08-03
Final Drill Date: 2000-08-16
Well Total Depth: 1655.00 m
Surface Hole Latitude: 56.514581
Surface Hole Longitude: -115.409296

For data sources see[1][2]

Well History

Date Event
2000-07-17 Obtained License
2000-08-04 Surface Casing Operation Performed
2000-08-06 Direction Drilling Operation Performed - Deviate
2000-08-12 Production Casing Operation Performed
2000-08-16 Finished Drilling
2000-08-16 Well Log Performed
2000-08-17 Liner Casing Operation Performed
2000-08-17 Rig Released
2000-08-17 Well Mode changed to Drilled and Cased
2000-08-22 Well Log Performed
2000-08-23 Perforation Treatment Performed - Jet Perforation
2000-08-23 Well Log Performed
2000-08-28 Perforation Treatment Performed - Jet Perforation
2000-08-28 Well Log Performed
2000-08-28 Well Mode changed to Drilled and Cased
2000-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-08-31 Perforation Treatment Performed - Fractured
2000-09-29 Well Began Production
2000-09-29 Well Fluid changed to Crude Oil
2000-09-29 Well Mode changed to Pumping
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-08-06 320.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-23 Perforation 1606.00 1610.00 17
2000-08-28 Perforation 1487.00 1493.00 17
2000-08-31 Acid Treatment 1487.00 1493.00 0
2000-08-31 Fracture 1487.00 1610.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2044 0.0 0.0 0.0
2001 3742 0.0 0.0 0.0
2002 252 0.0 0.0 0.0

For data sources see[6]

References