If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0875091307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.541219,"lon":-115.287699,"icon":""}]} |
| Location: 00/07-13-087-09W5/0 | |
| Location Alias: 00/07-13-87-09 W5M | |
| Location Alias 2: 00/07-13-087-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 13 | |
| County/Municipality: Municipal District of Opportunity No. 17 | |
| Well Name: MBOG REDEARTH 7-13-87-9 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0045200 | |
| License Date: 1973-02-22 | |
| License Status: Suspension | |
| Spud Date: 1973-02-26 | |
| Final Drill Date: 1973-03-13 | |
| Well Total Depth: 1466.70 m | |
| Surface Hole Latitude: 56.541219 | |
| Surface Hole Longitude: -115.287699 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1973-02-22 | Obtained License |
| 1973-03-13 | Finished Drilling |
| 1973-03-13 | Well Log Performed |
| 1973-03-13 | Well Mode changed to Drilled and Cased |
| 1973-03-14 | Drill Stem Test Performed |
| 1973-03-16 | Production Casing Operation Performed |
| 1973-03-27 | Perforation Treatment Performed - Jet Perforation |
| 1973-03-28 | Well Began Production |
| 1973-03-28 | Well Fluid changed to Crude Oil |
| 1973-03-28 | Well Mode changed to Flowing |
| 1973-08-25 | Well Fluid changed to Crude Oil |
| 1973-08-25 | Well Mode changed to Pumping |
| 1980-11-29 | Perforation Treatment Performed - Cement Squeeze |
| 1980-12-11 | Perforation Treatment Performed - Jet Perforation |
| 1981-03-09 | Well Began Injection |
| 1981-03-09 | Well Fluid changed to Water |
| 1981-03-09 | Well Type changed to Disposal |
| 1990-06-24 | Well Log Performed |
| 1990-06-25 | Well Log Performed |
| 1990-08-15 | Well Log Performed |
| 1990-09-27 | Well Log Performed |
| 1990-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-09-28 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-28 | Plug Back Performed |
| 1990-09-28 | Well Fluid changed to Water |
| 1990-09-28 | Well Mode changed to Abandoned Zone |
| 1990-09-28 | Well Type changed to Disposal |
| 1990-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-08-09 | Well Log Performed |
| 2008-04-11 | Perforation Treatment Performed - Jet Perforation |
| 2008-04-16 | Perforation Treatment Performed - Remedial Casing |
| 2008-04-24 | Perforation Treatment Performed - Jet Perforation |
| 2015-10-08 | Perforation Treatment Performed - Jet Perforation |
| 2015-10-19 | Well Log Performed |
| 2015-10-20 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2015-10-20 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1973-03-27 | Perforation | 1446.60 | 1447.50 | 7 |
| 2008-04-11 | Perforation | 427.00 | 428.00 | 13 |
| 2008-04-16 | Remedial Casing Cementing | 427.00 | 428.00 | 0 |
| 2008-04-24 | Perforation | 580.00 | 581.00 | 17 |
| 2015-10-08 | Perforation | 427.00 | 428.00 | 13 |
| 2015-10-20 | Casing Patch | 427.00 | 428.00 | 0 |
| 1973-03-27 | Perforation | 1447.20 | 1448.10 | 7 |
| 1980-11-29 | Cement Squeeze | 1446.60 | 1448.10 | 0 |
| 1980-12-11 | Perforation | 1451.10 | 1455.70 | 3 |
| 1980-12-11 | Perforation | 1453.00 | 1457.50 | 3 |
| 1990-09-28 | Packing Device Capped w/Cement | 1417.00 | 1425.00 | 0 |
| 1990-09-28 | Packing Device Capped w/Cement | 742.00 | 750.00 | 0 |
| 1990-09-28 | Perforation | 705.90 | 716.30 | 13 |
| 1990-09-29 | Acid Treatment | 705.90 | 716.30 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1973 | 3707 | 0.0 | 0.0 | 0.0 |
| 1974 | 8227 | 0.0 | 0.0 | 0.0 |
| 1975 | 8504 | 0.0 | 0.0 | 0.0 |
| 1976 | 7858 | 0.0 | 0.0 | 0.0 |
| 1977 | 7277 | 0.0 | 0.0 | 0.0 |
| 1978 | 7278 | 0.0 | 0.0 | 0.0 |
| 1979 | 7628 | 0.0 | 0.0 | 0.0 |
| 1980 | 5520 | 0.0 | 0.0 | 0.0 |
| 1981 | 0 | 0.0 | 0.0 | 0.0 |
| 1982 | 0 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
| 1985 | 0 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
| 1989 | 0 | 0.0 | 0.0 | 0.0 |
| 1990 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2008-04-25 | No Incident Encountered | 0.00 | 0.00 |
| 2015-10-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]