X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875100109000

Well Details

Well ID: 0875100109000
Loading map...
Location: 00/09-01-087-10W5/0
Location Alias: 00/09-01-87-10 W5M
Location Alias 2: 00/09-01-087-10 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 10
Section: 01
County/Municipality: Northern Sunrise County
Well Name: HARVEST ET AL HZ LOON 9-1-87-10
Operator Name: Harvest Operations Corp.
License Number: 0443519
License Date: 2012-01-30
License Status: Suspension
Spud Date: 2012-02-19
Final Drill Date: 2012-03-03
Well Total Depth: 3020.00 m
Surface Hole Latitude: 56.531721
Surface Hole Longitude: -115.456134

For data sources see[1][2]

Well History

Date Event
2012-01-30 Obtained License
2012-02-21 Direction Drilling Operation Performed - Deviate
2012-02-21 Surface Casing Operation Performed
2012-02-21 Well Log Performed
2012-02-26 Intermediate Casing Operation Performed
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-03-03 Finished Drilling
2012-03-03 Well Log Performed
2012-03-03 Well Mode changed to Drilled and Cased
2012-03-05 Liner Casing Operation Performed
2012-03-06 Rig Released
2012-03-06 Well Log Performed
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-03 Well Began Production
2012-05-03 Well Fluid changed to Crude Oil
2012-05-03 Well Mode changed to Pumping
2019-06-01 Well Fluid changed to Crude Oil
2019-06-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-19 Trinidad Drilling Ltd. 91 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-21 1088.00 Deviate (5 - 79 degrees)
2012-02-27 1451.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-14 Multi-Stage Fracture 2974.60 2978.50 0
2012-03-15 Multi-Stage Fracture 2300.60 2304.50 0
2012-03-15 Multi-Stage Fracture 2225.60 2229.60 0
2012-03-15 Multi-Stage Fracture 2150.70 2154.60 0
2012-03-15 Multi-Stage Fracture 2075.80 2079.70 0
2012-03-15 Multi-Stage Fracture 2000.80 2004.70 0
2012-03-15 Multi-Stage Fracture 1925.90 1929.80 0
2012-03-15 Multi-Stage Fracture 1850.90 1854.80 0
2012-03-15 Multi-Stage Fracture 1775.90 1779.90 0
2012-03-15 Multi-Stage Fracture 1701.00 1704.90 0
2012-03-15 Multi-Stage Fracture 1626.00 1630.00 0
2012-03-14 Multi-Stage Fracture 2899.90 2903.80 0
2012-03-15 Multi-Stage Fracture 1551.10 1555.00 0
2012-03-14 Multi-Stage Fracture 2825.10 2829.10 0
2012-03-14 Multi-Stage Fracture 2750.20 2754.10 0
2012-03-14 Multi-Stage Fracture 2675.20 2679.20 0
2012-03-14 Multi-Stage Fracture 2600.30 2604.20 0
2012-03-14 Multi-Stage Fracture 2525.40 2529.30 0
2012-03-14 Multi-Stage Fracture 2450.50 2454.40 0
2012-03-15 Multi-Stage Fracture 2375.50 2379.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4807 0.0 0.0 0.0
2013 7825 0.0 0.0 0.0
2014 7828 0.0 0.0 0.0
2015 7321 0.0 0.0 0.0
2016 7260 0.0 0.0 0.0
2017 7947 0.0 0.0 0.0
2018 7649 0.0 0.0 0.0
2019 2069 0.0 0.0 0.0

For data sources see[7]

References