If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0875130907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.52692,"lon":-116.004642,"icon":""}]} |
| Location: 00/07-09-087-13W5/0 | |
| Location Alias: 00/07-09-87-13 W5M | |
| Location Alias 2: 00/07-09-087-13 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 087 | |
| Meridian: 5 | |
| Range: 13 | |
| Section: 09 | |
| County/Municipality: Northern Sunrise County | |
| Well Name: REDEARTH ET AL EVI 7-9-87-13 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0082195 | |
| License Date: 1980-04-17 | |
| License Status: Abandoned | |
| Spud Date: 1980-04-21 | |
| Final Drill Date: 1980-05-07 | |
| Well Total Depth: 1632.00 m | |
| Surface Hole Latitude: 56.526920 | |
| Surface Hole Longitude: -116.004642 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-04-17 | Obtained License |
| 1980-05-07 | Finished Drilling |
| 1980-05-07 | Well Mode changed to Drilled and Cased |
| 1980-05-10 | Drill Stem Test Performed |
| 1980-05-12 | Production Casing Operation Performed |
| 1980-05-21 | Perforation Treatment Performed - Jet Perforation |
| 1980-05-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-05-22 | Perforation Treatment Performed - Cement Squeeze |
| 1980-06-06 | Perforation Treatment Performed - Jet Perforation |
| 1980-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-08-09 | Well Began Production |
| 1980-08-09 | Well Fluid changed to Crude Oil |
| 1980-08-09 | Well Mode changed to Flowing |
| 1983-10-28 | Perforation Treatment Performed - Cement Squeeze |
| 1983-10-28 | Perforation Treatment Performed - Jet Perforation |
| 1983-10-28 | Plug Back Performed |
| 1983-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-11-02 | Well Fluid changed to Crude Oil |
| 1983-11-02 | Well Mode changed to Pumping |
| 1984-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-10-05 | Well Fluid changed to Crude Oil |
| 1989-10-05 | Well Mode changed to Suspended |
| 1991-04-15 | Well Fluid changed to Crude Oil |
| 1991-04-15 | Well Mode changed to Pumping |
| 1991-11-05 | Perforation Treatment Performed - Chemical Squeeze |
| 1996-03-13 | Well Fluid changed to Crude Oil |
| 1996-03-13 | Well Mode changed to Suspended |
| 1996-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-12-09 | Plug Back Performed |
| 1996-12-09 | Well Fluid changed to Crude Oil |
| 1996-12-09 | Well Mode changed to Abandoned Zone |
| 2010-02-02 | Well Log Performed |
| 2010-02-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-07 | Well Log Performed |
| 2010-02-19 | Perforation Treatment Performed - Remedial Casing |
| 2010-02-20 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-20 | Well Log Performed |
| 2010-02-23 | Perforation Treatment Performed - Remedial Casing |
| 2010-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-24 | Well Log Performed |
| 2010-02-25 | Perforation Treatment Performed - Remedial Casing |
| 2010-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2010-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-26 | Well Log Performed |
| 2010-02-27 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-27 | Perforation Treatment Performed - Remedial Casing |
| 2010-02-27 | Well Log Performed |
| 2010-02-28 | Well Log Performed |
| 2010-03-01 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-01 | Perforation Treatment Performed - Remedial Casing |
| 2010-03-02 | Perforation Treatment Performed - Remedial Casing |
| 2010-03-02 | Well Log Performed |
| 2010-05-28 | Well Abandoned |
| 2010-05-28 | Well Fluid changed to Crude Oil |
| 2010-05-28 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-05-21 | Perforation | 1579.50 | 1580.50 | 7 |
| 1991-11-05 | Chemical Squeeze | 1568.00 | 1569.00 | 0 |
| 1996-12-09 | Packing Device Capped w/Cement | 1552.00 | 1560.00 | 0 |
| 2010-02-07 | Perforation | 769.00 | 769.60 | 99 |
| 2010-02-19 | Remedial Casing Cementing | 769.00 | 769.60 | 0 |
| 2010-02-20 | Perforation | 530.00 | 530.60 | 99 |
| 2010-02-20 | Perforation | 505.00 | 505.30 | 99 |
| 2010-02-23 | Remedial Casing Cementing | 530.00 | 530.60 | 0 |
| 2010-02-23 | Remedial Casing Cementing | 505.00 | 505.30 | 0 |
| 2010-02-24 | Perforation | 445.00 | 445.60 | 99 |
| 2010-02-24 | Perforation | 325.00 | 325.60 | 99 |
| 1980-05-22 | Acid Treatment | 1579.50 | 1580.50 | 0 |
| 2010-02-25 | Remedial Casing Cementing | 445.00 | 445.60 | 0 |
| 2010-02-25 | Remedial Casing Cementing | 325.00 | 325.60 | 0 |
| 2010-02-26 | Perforation | 397.00 | 398.00 | 17 |
| 2010-02-26 | Acid Treatment | 397.00 | 398.00 | 0 |
| 2010-02-27 | Remedial Casing Cementing | 397.00 | 398.00 | 0 |
| 2010-02-27 | Perforation | 375.00 | 375.60 | 99 |
| 2010-03-01 | Remedial Casing Cementing | 375.00 | 375.60 | 0 |
| 2010-03-01 | Perforation | 305.00 | 305.60 | 99 |
| 2010-03-02 | Remedial Casing Cementing | 305.00 | 305.60 | 0 |
| 1980-05-22 | Cement Squeeze | 1579.50 | 1580.50 | 0 |
| 1980-06-06 | Perforation | 1569.00 | 1570.00 | 7 |
| 1980-06-09 | Acid Treatment | 1569.00 | 1570.00 | 0 |
| 1983-10-28 | Cement Squeeze | 1569.00 | 1570.00 | 0 |
| 1983-10-28 | Perforation | 1568.00 | 1569.00 | 13 |
| 1983-11-01 | Acid Treatment | 1568.00 | 1569.00 | 0 |
| 1984-07-31 | Acid Treatment | 1568.00 | 1569.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 938 | 0.0 | 0.0 | 0.0 |
| 1981 | 4133 | 0.0 | 0.0 | 0.0 |
| 1982 | 5878 | 0.0 | 0.0 | 0.0 |
| 1983 | 7583 | 0.0 | 0.0 | 0.0 |
| 1984 | 8425 | 0.0 | 0.0 | 0.0 |
| 1985 | 8321 | 0.0 | 0.0 | 0.0 |
| 1986 | 7601 | 0.0 | 0.0 | 0.0 |
| 1987 | 8601 | 0.0 | 0.0 | 0.0 |
| 1988 | 8365 | 0.0 | 0.0 | 0.0 |
| 1989 | 5256 | 0.0 | 0.0 | 0.0 |
| 1991 | 5798 | 0.0 | 0.0 | 0.0 |
| 1992 | 8515 | 0.0 | 0.0 | 0.0 |
| 1993 | 8376 | 0.0 | 0.0 | 0.0 |
| 1994 | 7646 | 0.0 | 0.0 | 0.0 |
| 1995 | 5043 | 0.0 | 0.0 | 0.0 |
| 1996 | 982 | 0.0 | 0.0 | 0.0 |
For data sources see[5]