X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875140801002

Well Details

Well ID: 0875140801002
Loading map...
Location: 00/01-08-087-14W5/2
Location Alias: 00/01-08-87-14 W5M
Location Alias 2: 00/01-08-087-14 W5/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 14
Section: 08
County/Municipality: Northern Sunrise County
Well Name: FET GOLDEN 1-8-87-14
Operator Name: Harvest Operations Corp.
License Number: 0040247
License Date: 1971-06-10
License Status: Abandoned
Spud Date: 1971-06-23
Final Drill Date: 1971-07-04
Well Total Depth: 1627.60 m
Surface Hole Latitude: 56.526142
Surface Hole Longitude: -116.187977

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-06-10 Obtained License
1971-07-04 Finished Drilling
1971-07-06 Drill Stem Test Performed
1971-07-08 Production Casing Operation Performed
1971-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-07-11 Perforation Treatment Performed - Jet Perforation
1971-07-12 Perforation Treatment Performed - Jet Perforation
1971-07-13 Perforation Treatment Performed - Cement Squeeze
1971-07-15 Perforation Treatment Performed - Jet Perforation
1971-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-08 Perforation Treatment Performed - Cement Squeeze
1971-09-09 Perforation Treatment Performed - Cement Squeeze
1971-09-11 Perforation Treatment Performed - Acid Wash - No Pressure
1971-09-11 Perforation Treatment Performed - Jet Perforation
1972-03-14 Perforation Treatment Performed - Acid Wash - No Pressure
1972-03-14 Perforation Treatment Performed - Jet Perforation
1974-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-16 Perforation Treatment Performed - Jet Perforation
1974-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-10 Perforation Treatment Performed - Cement Squeeze
1975-03-13 Perforation Treatment Performed - Jet Perforation
1975-03-15 Perforation Treatment Performed - Jet Perforation
1975-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-16 Well Mode changed to Drilled and Cased
1978-07-11 Well Began Injection
1978-07-11 Well Fluid changed to Water
1978-07-11 Well Type changed to Disposal
1979-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-04-30 Perforation Treatment Performed - Jet Perforation
1980-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-30 Perforation Treatment Performed - Jet Perforation
1991-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-01 Well Fluid changed to Water
1993-12-01 Well Mode changed to Suspended
1993-12-01 Well Type changed to Disposal
1995-03-22 Well Fluid changed to Water
1995-03-22 Well Type changed to Disposal
1995-08-08 Well Fluid changed to Water
1995-08-08 Well Mode changed to Suspended
1995-08-08 Well Type changed to Disposal
1995-08-30 Perforation Treatment Performed - Jet Perforation
1995-08-31 Perforation Treatment Performed - Casing Patch (Over Perfs)
1995-09-07 Well Fluid changed to Water
1995-09-07 Well Type changed to Disposal
1998-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-11 Well Log Performed
2009-10-13 Perforation Treatment Performed - Cement Squeeze
2009-10-13 Plug Back Performed
2009-10-13 Well Fluid changed to Water
2009-10-13 Well Mode changed to Abandoned Zone
2009-10-13 Well Type changed to Disposal
2009-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-14 Perforation Treatment Performed - Jet Perforation
2009-10-15 Perforation Treatment Performed - Cement Plug
2009-10-15 Perforation Treatment Performed - Remedial Casing
2009-10-16 Well Log Performed
2009-10-17 Well Abandoned
2009-10-17 Well Fluid changed to Water
2009-10-17 Well Mode changed to Abandoned
2009-10-17 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-07-11 Perforation 515.70 516.90 13
1971-09-11 Perforation 1592.00 1594.40 13
1971-09-11 Acid Wash 1592.00 1594.40 0
1972-03-14 Perforation 1589.20 1589.80 13
1972-03-14 Perforation 1591.70 1593.20 13
1972-03-14 Acid Wash 1589.20 1594.40 0
1974-01-16 Perforation 1600.20 1601.70 7
1974-01-16 Acid Treatment 1600.20 1601.70 0
1974-01-17 Acid Treatment 1589.20 1601.70 0
1975-03-10 Cement Squeeze 1589.20 1601.70 0
1975-03-13 Perforation 1617.00 1618.50 13
1971-07-11 Acid Treatment 515.70 516.90 0
1975-03-15 Perforation 1617.00 1617.30 13
1975-03-16 Acid Treatment 1617.00 1618.50 0
1979-05-24 Acid Treatment 1617.00 1618.50 0
1980-04-30 Perforation 1604.50 1607.30 10
1980-09-20 Acid Treatment 1604.50 1618.50 0
1980-10-06 Acid Treatment 1604.50 1618.50 0
1985-05-01 Acid Treatment 1604.50 1617.30 0
1987-08-05 Acid Treatment 1604.50 1617.30 0
1988-08-11 Acid Treatment 1604.50 1617.30 0
1991-07-30 Perforation 1592.00 1601.70 13
1971-07-12 Perforation 595.90 597.40 7
1991-07-31 Acid Treatment 1592.00 1607.30 0
1995-08-30 Perforation 595.90 597.40 7
1995-08-30 Perforation 515.70 516.90 13
1995-08-31 Casing Patch 595.90 597.40 0
1995-08-31 Casing Patch 515.70 516.90 0
1998-07-16 Acid Treatment 1592.00 1607.30 0
2009-10-13 Cement Squeeze 1592.00 1607.30 0
2009-10-14 Packing Device Capped w/Cement 1543.20 1552.20 0
2009-10-14 Perforation 340.00 341.00 2
2009-10-15 Remedial Casing Cementing 340.00 341.00 0
1971-07-13 Cement Squeeze 595.90 597.40 0
2009-10-15 Cement Plug 316.80 330.00 0
1971-07-13 Cement Squeeze 515.70 516.90 0
1971-07-15 Perforation 1593.20 1595.30 7
1971-07-16 Acid Treatment 1593.20 1595.30 0
1971-09-08 Cement Squeeze 515.70 516.90 0
1971-09-09 Cement Squeeze 1593.20 1595.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References