If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875250604002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/04-06-087-25W5/2 | |
Location Alias: 00/04-06-87-25 W5M | |
Location Alias 2: 00/04-06-087-25 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 25 | |
Section: 06 | |
County/Municipality: County of Northern Lights | |
Well Name: SPYGLASS DIXON 4-6-87-25 | |
Operator Name: Eagle Energy Inc. | |
License Number: 0168019 | |
License Date: 1994-06-20 | |
License Status: Issued | |
Spud Date: 1994-07-21 | |
Final Drill Date: 1994-07-25 | |
Well Total Depth: 905.00 m | |
Surface Hole Latitude: 56.512213 | |
Surface Hole Longitude: -117.983046 |
Date | Event |
---|---|
1994-06-20 | Obtained License |
1994-07-22 | Surface Casing Operation Performed |
1994-07-25 | Finished Drilling |
1994-07-25 | Well Log Performed |
1994-07-25 | Well Mode changed to Drilled and Cased |
1994-07-26 | Drill Stem Test Performed |
1994-07-26 | Well Log Performed |
1994-07-28 | Production Casing Operation Performed |
1994-07-28 | Rig Released |
1994-08-08 | Well Log Performed |
1994-08-09 | Perforation Treatment Performed - Jet Perforation |
1994-10-27 | Well Began Production |
1994-10-27 | Well Fluid changed to Gas |
1994-10-27 | Well Mode changed to Flowing |
1995-06-09 | Well Log Performed |
1995-06-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-06-10 | Perforation Treatment Performed - Cement Squeeze |
1995-06-10 | Plug Back Performed |
1995-06-10 | Well Fluid changed to Gas |
1995-06-10 | Well Mode changed to Flowing |
1995-06-11 | Perforation Treatment Performed - Jet Perforation |
1995-06-12 | Perforation Treatment Performed - Jet Perforation |
1995-06-12 | Well Log Performed |
1995-06-15 | Perforation Treatment Performed - Jet Perforation |
1995-06-15 | Well Log Performed |
1997-07-31 | Well Fluid changed to Gas |
1997-07-31 | Well Mode changed to Suspended |
1998-06-21 | Perforation Treatment Performed - Jet Perforation |
1998-06-22 | Well Log Performed |
1998-06-23 | Perforation Treatment Performed - Jet Perforation |
1998-06-25 | Well Fluid changed to Gas |
1998-06-25 | Well Mode changed to Suspended |
1999-05-01 | Well Fluid changed to Gas |
1999-05-01 | Well Mode changed to Suspended |
1999-05-07 | Well Log Performed |
2006-12-15 | Perforation Treatment Performed - Jet Perforation |
2006-12-15 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-08-09 | Perforation | 850.00 | 851.00 | 13 |
2006-12-15 | Perforation | 749.00 | 750.50 | 17 |
2006-12-15 | Perforation | 740.00 | 742.50 | 17 |
2006-12-15 | Perforation | 721.00 | 722.50 | 17 |
1994-08-09 | Perforation | 804.00 | 809.00 | 14 |
1995-06-10 | Cement Squeeze | 804.00 | 809.00 | 0 |
1995-06-10 | Packing Device Capped w/Cement | 815.90 | 840.00 | 0 |
1995-06-11 | Perforation | 808.00 | 809.50 | 13 |
1995-06-12 | Perforation | 809.00 | 810.00 | 14 |
1995-06-15 | Perforation | 809.50 | 810.50 | 14 |
1998-06-21 | Perforation | 749.00 | 750.50 | 13 |
1998-06-23 | Perforation | 745.50 | 747.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 421 | 0.0 | 0.0 | 0.0 |
For data sources see[5]