If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0876012406002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/06-24-087-01W6/2 | |
Location Alias: 00/06-24-87-01 W6M | |
Location Alias 2: 00/06-24-087-01 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 6 | |
Range: 01 | |
Section: 24 | |
County/Municipality: County of Northern Lights | |
Well Name: INSIGNIAENERGY DIXON 6-24-87-1 | |
Operator Name: Insignia Energy Ltd. | |
License Number: 0016269 | |
License Date: 1958-11-19 | |
License Status: Abandoned | |
Spud Date: 1958-11-20 | |
Final Drill Date: 1958-12-23 | |
Well Total Depth: 1992.80 m | |
Surface Hole Latitude: 56.558195 | |
Surface Hole Longitude: -118.017223 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-11-19 | Obtained License |
1958-11-28 | Drill Stem Test Performed |
1958-11-29 | Drill Stem Test Performed |
1958-12-19 | Drill Stem Test Performed |
1958-12-20 | Drill Stem Test Performed |
1958-12-23 | Finished Drilling |
1958-12-27 | Drill Stem Test Performed |
1958-12-28 | Drill Stem Test Performed |
1958-12-30 | Production Casing Operation Performed |
1959-01-25 | Perforation Treatment Performed - Bullet Perforation |
1959-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-03 | Perforation Treatment Performed - Cement Squeeze |
1959-02-04 | Perforation Treatment Performed - Cement Squeeze |
1959-02-06 | Perforation Treatment Performed - Bullet Perforation |
1959-02-07 | Perforation Treatment Performed - Cement Squeeze |
1959-02-13 | Perforation Treatment Performed - Bullet Perforation |
1959-02-14 | Perforation Treatment Performed - Cement Squeeze |
1959-02-16 | Perforation Treatment Performed - Bullet Perforation |
1959-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-07-07 | Well Log Performed |
1995-07-08 | Perforation Treatment Performed - Jet Perforation |
1995-07-08 | Well Mode changed to Drilled and Cased |
1995-07-29 | Well Began Production |
1995-07-29 | Well Fluid changed to Gas |
1995-07-29 | Well Mode changed to Flowing |
1996-09-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-21 | Perforation Treatment Performed - Jet Perforation |
1996-09-21 | Plug Back Performed |
1996-09-21 | Well Log Performed |
1996-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-23 | Perforation Treatment Performed - Cement Squeeze |
1996-09-23 | Plug Back Performed |
1996-10-19 | Well Abandoned |
1996-10-19 | Well Fluid changed to Gas |
1996-10-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-01-25 | Bullet Perforation | 934.80 | 937.30 | 13 |
1959-02-13 | Bullet Perforation | 773.30 | 773.90 | 13 |
1959-02-13 | Bullet Perforation | 774.80 | 775.70 | 13 |
1959-02-13 | Bullet Perforation | 777.80 | 778.80 | 13 |
1959-02-14 | Cement Squeeze | 762.30 | 778.80 | 0 |
1959-02-16 | Bullet Perforation | 762.60 | 763.20 | 13 |
1959-02-16 | Bullet Perforation | 765.40 | 768.40 | 13 |
1959-02-16 | Bullet Perforation | 771.10 | 771.80 | 13 |
1959-02-16 | Bullet Perforation | 771.10 | 771.80 | 13 |
1959-02-16 | Bullet Perforation | 773.30 | 773.90 | 13 |
1959-02-16 | Bullet Perforation | 774.80 | 775.70 | 13 |
1959-01-26 | Acid Treatment | 934.80 | 937.30 | 0 |
1959-02-16 | Bullet Perforation | 777.80 | 778.80 | 13 |
1959-02-18 | Acid Treatment | 762.30 | 778.80 | 0 |
1995-07-08 | Perforation | 1854.40 | 1858.00 | 7 |
1996-09-21 | Packing Device Capped w/Cement | 1837.00 | 1845.00 | 0 |
1996-09-21 | Perforation | 753.50 | 754.70 | 13 |
1996-09-23 | Cement Squeeze | 753.50 | 778.80 | 0 |
1996-09-23 | Packing Device Capped w/Cement | 662.00 | 759.60 | 0 |
1959-02-03 | Cement Squeeze | 934.80 | 937.30 | 0 |
1959-02-04 | Cement Squeeze | 934.80 | 937.30 | 0 |
1959-02-06 | Bullet Perforation | 877.20 | 878.40 | 0 |
1959-02-07 | Cement Squeeze | 877.20 | 878.40 | 0 |
1959-02-13 | Bullet Perforation | 762.30 | 763.20 | 13 |
1959-02-13 | Bullet Perforation | 765.40 | 768.40 | 13 |
1959-02-13 | Bullet Perforation | 771.10 | 771.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1525 | 0.0 | 0.0 | 0.0 |
1996 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]